Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Inspections
Type:
Development Package
Address:
3749 N ROMERO RD
Address NEW:
3749 N ROMERO RD
Apply Date:
06/09/2026
Applicant:
Dennis Manley
Description:
Minor Development Plan for R.E. Darling Co. The proposed use of the project is general manufacturing. R.E. Darling Co., is a composite manufacturing plant that manufactures rubber products using methods such as calendared rubber, EPDM rubber, custom rubber mixing and compression molding. manufactured products include: REDAR hose life support products for aerospace, defense and critical applications; military aviation oxygen breathing hose, connector to regulator; emergency oxygen supply bottle kit for aircraft ejection seats; lox hose (liquid oxygen system)-pilot support; life support hose manufacturing; rocket motor case insulation; composite compression molding; DAR PRO mining products.

Permit Reviews

Permit Number - TD-DEV-0626-00148
Permit Status: Inspections
Permit Description: Minor Development Plan for R.E. Darling Co. The proposed use of the project is general manufacturing. R.E. Darling Co., is a composite manufacturing plant that manufactures rubber products using methods such as calendared rubber, EPDM rubber, custom rubber mixing and compression molding. manufactured products include: REDAR hose life support products for aerospace, defense and critical applications; military aviation oxygen breathing hose, connector to regulator; emergency oxygen supply bottle kit for aircraft ejection seats; lox hose (liquid oxygen system)-pilot support; life support hose manufacturing; rocket motor case insulation; composite compression molding; DAR PRO mining products.
Start Date Submittal Complete Date Status  
08/05/2026 DEVELOPMENT PACKAGE NEW v.3 08/24/2026 REQUIRES RESUBMIT Review Details
06/17/2026 DEVELOPMENT PACKAGE NEW v.2 07/17/2026 REQUIRES RESUBMIT Review Details
06/10/2026 DEVELOPMENT PACKAGE NEW v.1 06/12/2026 REQUIRES RESUBMIT Review Details
08/27/2026 DEVELOPMENT PACKAGE NEW v.4 09/02/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0626-00148
Permit Status: Inspections
Permit Description: Minor Development Plan for R.E. Darling Co. The proposed use of the project is general manufacturing. R.E. Darling Co., is a composite manufacturing plant that manufactures rubber products using methods such as calendared rubber, EPDM rubber, custom rubber mixing and compression molding. manufactured products include: REDAR hose life support products for aerospace, defense and critical applications; military aviation oxygen breathing hose, connector to regulator; emergency oxygen supply bottle kit for aircraft ejection seats; lox hose (liquid oxygen system)-pilot support; life support hose manufacturing; rocket motor case insulation; composite compression molding; DAR PRO mining products.
Total Outstanding Activity Conditions - 1
Date Name
07/17/2026 CRWH PLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Conditions

Permit Number - TD-DEV-0626-00148
Permit Status: Inspections
Permit Description: Minor Development Plan for R.E. Darling Co. The proposed use of the project is general manufacturing. R.E. Darling Co., is a composite manufacturing plant that manufactures rubber products using methods such as calendared rubber, EPDM rubber, custom rubber mixing and compression molding. manufactured products include: REDAR hose life support products for aerospace, defense and critical applications; military aviation oxygen breathing hose, connector to regulator; emergency oxygen supply bottle kit for aircraft ejection seats; lox hose (liquid oxygen system)-pilot support; life support hose manufacturing; rocket motor case insulation; composite compression molding; DAR PRO mining products.
Date Description Comments
09/02/2026 Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/02/2026 Pre-Issuance - Required Documents - Dust Control/Air Quality Permit is Required. (Utilized with DP's & TP's)

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0626-00148
Permit Description: Minor Development Plan for R.E. Darling Co. The proposed use of the project is general manufacturing. R.E. Darling Co., is a composite manufacturing plant that manufactures rubber products using methods such as calendared rubber, EPDM rubber, custom rubber mixing and compression molding. manufactured products include: REDAR hose life support products for aerospace, defense and critical applications; military aviation oxygen breathing hose, connector to regulator; emergency oxygen supply bottle kit for aircraft ejection seats; lox hose (liquid oxygen system)-pilot support; life support hose manufacturing; rocket motor case insulation; composite compression molding; DAR PRO mining products.
Total Completed Inspections - 2
Date Description Inspector Results Comments
09/10/2026 PDSD Engineering Division Pre-Construction SITE Passed Schedule stormwater initial and NPPO initial
Inspections needed:
Sidewalk/flat work
Paving
Striping and signage
Drainage structures
Grading
Landscape irrigation
Landscape, Final appearance and function
Engineering final
SWPPP biweekly
09/21/2026 NPPO Pre-Construction Passed -3 Parkinsonia Florida (Palo verde)
-5 Prosopis Velutina (Mesquite velvet)
-1 soapberry tree
All are roped off and protected.
-No nursury needed all are PIP
-13 velvet Mequites will be mitigated.

Documents

File Name Document Type  
250225 REDAR DRAINAGE REPORT REV0_V1.PDF DOCUMENTS VIEW
APPROVED - PLAN SET-REDAR MILL ROOM, SITE PACKAGE, DRAWINGS - 100 SUBMITTAL (8-26-2026)-A4_V4 - STAMPED 09.02.2026.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
PLAN SET-REDAR MILL ROOM, SITE PACKAGE, DRAWINGS - 100 SUBMITTAL (8-26-2026)-A4_V4.PDF DOCUMENTS VIEW
REDAR MILL ROOM, SITE PACKAGE, DRAINAGE REPORT - 100 SUBMITTAL (8-26-2026)_V3.PDF DOCUMENTS VIEW
REDAR NEW MILL ROOM FACILITY GEOTECHNICAL ENGINEERING REPORT_ALTA EI_11-13-2025 (REVISED 11.24.25)-2026-07-31_V2.PDF DOCUMENTS VIEW