Permit Details

Status:
Complete
Type:
Development Package
Address:
2886 N 1ST AV
Address NEW:
2886 N 1ST AV
Apply Date:
05/01/2024
Applicant:
David Williamson, Jr.
Description:
Reconstruction of south building due to fire damage

Permit Reviews

Permit Number - TD-DEV-0524-00141
Permit Status: Complete
Permit Description: Reconstruction of south building due to fire damage
Start Date Submittal Complete Date Status  
08/30/2024 DEVELOPMENT PACKAGE NEW v.3 10/03/2024 REQUIRES RESUBMIT Review Details
10/04/2024 DEVELOPMENT PACKAGE NEW v.4 10/09/2024 APPROVED Review Details
05/15/2024 DEVELOPMENT PACKAGE NEW v.2 07/10/2024 REQUIRES RESUBMIT Review Details
05/02/2024 DEVELOPMENT PACKAGE NEW v.1 05/09/2024 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0524-00141
Permite Description: Reconstruction of south building due to fire damage
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/05/2025 ENGR Engineering Final N/A Partial Pass contractor needs to finish some landscaping finish The riprap needs filter fabric underneath it. Also need to curb cut on the northwest side or the basin area. good for level four TCO

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0524-00141
Permit Description: Reconstruction of south building due to fire damage
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/07/2025 PDSD Engineering Division Pre-Construction SITE Passed Went over the plans with the contractor informed to put wattles along USA pond parking lot area and along first Avenue. Call every two weeks for inspections.
02/21/2025 ENGR - Drainage Structures Passed Trash enclosure slab and approach good to pour, this also included the grout inspection and the weep holes we’re visible 02/21/25
05/08/2025 ENGR Engineering Final Passed