Permit: TD-DEV-0524-00141
Permit Details
Apply Date:
05/01/2024
Applicant:
David Williamson, Jr.
Description:
Reconstruction of south building due to fire damage
Permit Reviews
Permit Number - TD-DEV-0524-00141
Permit Status: Complete
Permit Description: Reconstruction of south building due to fire damage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/30/2024 | DEVELOPMENT PACKAGE NEW v.3 | 10/03/2024 | REQUIRES RESUBMIT |
| 10/04/2024 | DEVELOPMENT PACKAGE NEW v.4 | 10/09/2024 | APPROVED |
| 05/15/2024 | DEVELOPMENT PACKAGE NEW v.2 | 07/10/2024 | REQUIRES RESUBMIT |
| 05/02/2024 | DEVELOPMENT PACKAGE NEW v.1 | 05/09/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0524-00141
Permite Description: Reconstruction of south building due to fire damage
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2025 | ENGR Engineering Final | N/A | Partial Pass | contractor needs to finish some landscaping finish The riprap needs filter fabric underneath it. Also need to curb cut on the northwest side or the basin area. good for level four TCO |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0524-00141
Permit Description: Reconstruction of south building due to fire damage
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Went over the plans with the contractor informed to put wattles along USA pond parking lot area and along first Avenue. Call every two weeks for inspections. | |
| 02/21/2025 | ENGR - Drainage Structures | Passed | Trash enclosure slab and approach good to pour, this also included the grout inspection and the weep holes we’re visible 02/21/25 | |
| 05/08/2025 | ENGR Engineering Final | Passed |