Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Development Package
Address NEW:
1100 E Silverlake RD
Apply Date:
04/30/2026
Applicant:
Claire Eddleman-Heath
Description:
Linked to CIP-0925-00024-Thanks to Tucson Delivers Proposition 407 bond funding and generous support from the Water Infrastructure Finance Authority of Arizona, Mirasol Park will soon receive lighting and electrical improvements, a resurfaced parking lot, landscape enhancements, a new comfort station, and a new play area.

Permit Reviews

Permit Number - TD-DEV-0426-00116
Permit Status: Inspections
Permit Description: Linked to CIP-0925-00024-Thanks to Tucson Delivers Proposition 407 bond funding and generous support from the Water Infrastructure Finance Authority of Arizona, Mirasol Park will soon receive lighting and electrical improvements, a resurfaced parking lot, landscape enhancements, a new comfort station, and a new play area.
Start Date Submittal Complete Date Status  
04/30/2026 DEVELOPMENT PACKAGE NEW v.1 05/06/2026 APPROVED Review Details

Conditions

Permit Number - TD-DEV-0426-00116
Permit Status: Inspections
Permit Description: Linked to CIP-0925-00024-Thanks to Tucson Delivers Proposition 407 bond funding and generous support from the Water Infrastructure Finance Authority of Arizona, Mirasol Park will soon receive lighting and electrical improvements, a resurfaced parking lot, landscape enhancements, a new comfort station, and a new play area.
Date Description Comments
04/30/2026 Prior to Final documents, fees and contractor

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0426-00116
Permit Description: Linked to CIP-0925-00024-Thanks to Tucson Delivers Proposition 407 bond funding and generous support from the Water Infrastructure Finance Authority of Arizona, Mirasol Park will soon receive lighting and electrical improvements, a resurfaced parking lot, landscape enhancements, a new comfort station, and a new play area.
Total Completed Inspections - 1
Date Description Inspector Results Comments
06/04/2026 PDSD Engineering Division Pre-Construction SITE Passed Inspections needed:
Grading Final (schedule when basins cut before landscaping)
Paving Inspections
Landscape Appearance and function final
Flatwork
Striping
Signage
Engineering Final

No SWPPP, but wattle will be placed as discussed with super to protect the roads to North and South of site. Track out will be placed at contraction entrance at Silver lake. When needed to keep sediment out of road. Otherwise use same Erosion Control Best Practices as if there were a SWPPP. Snow fencing to be placed at preserve in place trees per detail on DP.
Okay to Start work