Permit: TD-DEV-0426-00116

Parcel: 129122690

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
06/04/2026 PDSD Engineering Division Pre-Construction SITE Passed Inspections needed:
Grading Final (schedule when basins cut before landscaping)
Paving Inspections
Landscape Appearance and function final
Flatwork
Striping
Signage
Engineering Final

No SWPPP, but wattle will be placed as discussed with super to protect the roads to North and South of site. Track out will be placed at contraction entrance at Silver lake. When needed to keep sediment out of road. Otherwise use same Erosion Control Best Practices as if there were a SWPPP. Snow fencing to be placed at preserve in place trees per detail on DP.
Okay to Start work