Permit Number - TD-DEV-0425-00121
Permit Status: Inspections
Permit Description: Interior modifications & site modifications
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/26/2026 | DEVELOPMENT PACKAGE NEW v.3 | 01/27/2026 | APPROVED |
| 09/15/2025 | DEVELOPMENT PACKAGE NEW v.2 | 10/17/2025 | REQUIRES RESUBMIT |
| 04/21/2025 | DEVELOPMENT PACKAGE NEW v.1 | 05/28/2025 | REQUIRES RESUBMIT |
| 04/01/2026 | DEVELOPMENT PACKAGE NEW v.2 | 04/02/2026 | APPROVED |
| 02/17/2026 | DEVELOPMENT PACKAGE NEW v.1 | 02/25/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-0425-00121
Permit Status: Inspections
Permit Description: Interior modifications & site modifications
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/09/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Conditions
Permit Number - TD-DEV-0425-00121
Permit Status: Inspections
Permit Description: Interior modifications & site modifications
| Date | Description | Comments |
|---|---|---|
| 02/17/2026 | Additional Historic review required prior to issuance |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0425-00121
Permite Description: Interior modifications & site modifications
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2026 | N/A | Partial Pass | Curbs poured to date okay. vibrate future pours lo limit aggregate exposure. | |
| 09/21/2026 | Consultation SITE | N/A | Partial Pass | Discussed TCO requirements , and checked AB for sidewalk pour. Schedule an additional consultation for the 5th of October for another walkthrough for TCO |
| 10/01/2026 | ENGR Paving | N/A | Partial Pass | AB has been placed and compaction testing comply. Blue tops in place and correct AB should be rolled in areas that are drying from storm earlier this week and any other loose spots and along curb edges. From curb corner of grading detail 1 over to WHIA retention island AB needs to be evened out in order that depth of AB is 8.5" off of top of curb. Ensure that all storm water in this area flows to inlets to prevent puddling. AB needs additional rolling where it meets concrete walkway at south end paving. Okay to pave pending pictures if areas mentioned addressed and rolled smooth. |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0425-00121
Permit Description: Interior modifications & site modifications
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/06/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Schedule inspections for grading, refuse enclosures, sidewalks/Flatwork for curb ramps and concrete paving, paving when done with subgrade and after ABC is placed. Also landscaping, striping and signage. Feel free to schedule site consultations for questions when needed. |