| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/18/2025 | DEVELOPMENT PACKAGE NEW v.1 | 05/28/2025 | REQUIRES RESUBMIT |
| 11/26/2025 | DEVELOPMENT PACKAGE NEW v.2 | 12/22/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TD-DEV-0425-00119
Permit Status: Inspections
Permit Description: Restricted record - Expansion to the existing Sanctuary
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/19/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0425-00119
Permite Description: Restricted record - Expansion to the existing Sanctuary
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2026 | Grading Progress ENGR | N/A | Partial Pass | -Basin 1 is being excavated and will be scarified. Progress good, per plan. But it is not complete. Bottom is to be 2.1 ft and flat with basin top sloped at 3:1. Do not compact basin bottom. -Area to west that will be new parking has been demoed and subgrade to be scarified and compacted to 95%. When subgrade elevations per plan and is ready for 3" over 6" heavy duty paving per plan, reschedule grading inspection or paving inspection. Schedule flatwork inspection prior to pouring curb/sidewalk. |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0425-00119
Permit Description: Restricted record - Expansion to the existing Sanctuary
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Treat site as if it had a SWPPP plan Flat work/sidewalk inspection -paving inspections -landscape irrigation -landscape function and appearance final -Wall inspections for footer of and pre-grout of wall -site consultation. Any keynotes and details that I forgot give me a call to check if inspections is necessary. Contractor will be getting utility permit extended and right of way permit |
|
| 10/06/2026 | Passed | -Basin 1 is being excavated and will be scarified. Progress good, per plan. But it is not complete. Bottom is to be 2.1 ft and flat with basin top sloped at 3:1. Do not compact basin bottom. -Area to west that will be new parking has been demoed and subgrade to be scarified and compacted to 95%. When subgrade elevations per plan and is ready for 3" over 6" heavy duty paving per plan. Reschedule grading inspection or paving inspection. Schedule flatwork inspection prior to pouring curb/sidewalk. |