Inspection History Details
Inspection Status: Partial Pass
Inspection History: Grading Progress ENGR
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2026 | Grading Progress ENGR | Partial Pass | -Basin 1 is being excavated and will be scarified. Progress good, per plan. But it is not complete. Bottom is to be 2.1 ft and flat with basin top sloped at 3:1. Do not compact basin bottom. -Area to west that will be new parking has been demoed and subgrade to be scarified and compacted to 95%. When subgrade elevations per plan and is ready for 3" over 6" heavy duty paving per plan, reschedule grading inspection or paving inspection. Schedule flatwork inspection prior to pouring curb/sidewalk. |