Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TD-DEV-0425-00119

Parcel: 11105030F


Addresses:

3201 E PRESIDIO RD

Inspection Status: Partial Pass

Inspection History: Grading Progress ENGR

Date Description Inspector Results Comments
10/06/2026 Grading Progress ENGR Partial Pass -Basin 1 is being excavated and will be scarified. Progress good, per plan. But it is not complete. Bottom is to be 2.1 ft and flat with basin top sloped at 3:1. Do not compact basin bottom.
-Area to west that will be new parking has been demoed and subgrade to be scarified and compacted to 95%. When subgrade elevations per plan and is ready for 3" over 6" heavy duty paving per plan, reschedule grading inspection or paving inspection. Schedule flatwork inspection prior to pouring curb/sidewalk.