Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Development Package
Address:
222 S 5TH AV
Address NEW:
222 S 5TH AV
Apply Date:
04/14/2025
Applicant:
Araceli Juarez
Description:
CIP-0924-00032-Renovate restrooms, new shade structure, new benches/tables, renovate sidewalks and plaza, area lighting

Permit Reviews

Permit Number - TD-DEV-0425-00113
Permit Status: Inspections
Permit Description: CIP-0924-00032-Renovate restrooms, new shade structure, new benches/tables, renovate sidewalks and plaza, area lighting
Start Date Submittal Complete Date Status  
05/20/2025 DEVELOPMENT PACKAGE NEW v.2 05/23/2025 APPROVED Review Details
04/29/2025 DEVELOPMENT PACKAGE NEW v.1 05/09/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0425-00113
Permit Status: Inspections
Permit Description: CIP-0924-00032-Renovate restrooms, new shade structure, new benches/tables, renovate sidewalks and plaza, area lighting
Total Outstanding Activity Conditions - 2
Date Name
05/23/2025 Prior to Final documents, fees and contractor need to be satisfied
05/23/2025 Utility Permit required for all underground electrical, sewer, potable water, and irrigation that is not covered under the related building permits. Prior to Final

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0425-00113
Permite Description: CIP-0924-00032-Renovate restrooms, new shade structure, new benches/tables, renovate sidewalks and plaza, area lighting
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
03/27/2026 Consultation SITE N/A Canceled
03/27/2026 N/A Partial Pass Contractor has formed north 14" inch poured concrete wall 3 feet high in front of pavilion supports. Forms are good, chamfer in place. A couple of the vert spacing not correct, contractor will send pictures of additional verts. 18 inches on center both ways. South forms not complete but are mirror of North form verts and horz correct. Send pictures of completed forms before pouring pony walls.
03/25/2026 N/A Partial Pass contact you pour the stairs in the sidewalk in front of the building

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0425-00113
Permit Description: CIP-0924-00032-Renovate restrooms, new shade structure, new benches/tables, renovate sidewalks and plaza, area lighting
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/19/2025 PDSD Engineering Division Pre-Construction SITE Passed

Scheduled Inspections

Scheduled Inspections - TD-DEV-0425-00113
Status: Inspections
Description: CIP-0924-00032-Renovate restrooms, new shade structure, new benches/tables, renovate sidewalks and plaza, area lighting
Scheduled Date Description Entered By Entered Date
04/06/2026 Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
ARMORY PARK CD SET - COMBINED SET.R2_V2.PDF DOCUMENTS VIEW