Inspection History Details
Inspection Status: Not Ready
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2026 | Not Ready | Contractor still grading the pad. Also needs compaction test. Contractor will call in another inspection for tomorrow. | ||
| 03/25/2026 | Partial Pass | contact you pour the stairs in the sidewalk in front of the building | ||
| 03/27/2026 | Partial Pass | Flat work at/under Pavilion from Ramp Sidewalk already approved over to cold joint. Use expansion joint material every 40 feet and at cold joints. Construction joints at 10 feet. Subgrade compacted, submit densities to the portal. OK to pour flat work in this area. | ||
| 04/06/2026 | Partial Pass | 10" sidewalk 6" thick. from cold joint at Pavilion running North roughly 60'. Compaction complies. Forms and slope correct. Okay to pour. Per PAG 200 25' of the 6" concrete band on North side of Pavilion okay to pour. |
||
| 04/13/2026 | Partial Pass | Continue approximately 50' of 6" x 10' wide panels from last cold joint of sidewalk going north from band pavilion towards ROW on 12th St. 40' max between expansion joints. Forms good, okay to pour sidewalk. | ||
| 04/15/2026 | Partial Pass | Dog run sidewalk slab West side of forms had to be adjusted to stay under 2%. Forms now comply. Compaction testing good. OK to pour slab of dog run. |