Permit Details

Status:
Complete
Type:
Development Package
Address:
3552 N STONE AV
Address NEW:
3552 N STONE AV
Apply Date:
04/25/2023
Applicant:
Andrew Denton
Description:
Addition of gate & fencing to existing multi-family project

Permit Reviews

Permit Number - TD-DEV-0423-00222
Permit Status: Complete
Permit Description: Addition of gate & fencing to existing multi-family project
Start Date Submittal Complete Date Status  
06/12/2023 DEVELOPMENT PACKAGE NEW v.1 07/07/2023 APPROVED Review Details
04/28/2023 DEVELOPMENT PACKAGE REVIEW v.2 06/01/2023 REQUIRES RESUBMIT Review Details
04/25/2023 DEVELOPMENT PACKAGE REVIEW v.1 04/26/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0423-00222
Permite Description: Addition of gate & fencing to existing multi-family project
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/05/2024 PDSD Site/Engineering Division - NPPO N/A Not Applicable No NPPO changed or added per plan.

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0423-00222
Permit Description: Addition of gate & fencing to existing multi-family project
Total Completed Inspections - 12
Date Description Inspector Results Comments
04/05/2024 PDSD Site/Engineering Division - Landscaping Passed
04/05/2024 Final inspection to ensure all landscape and water harvesting SITE Passed
04/05/2024 SITE Passed
04/05/2024 SITE - Stormwater Final Inspection Passed
04/05/2024 SITE - Stormwater Setup and Controls Passed
04/05/2024 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection Passed
04/05/2024 PDSD Engineering Division Pre-Construction SITE Passed Work completed without preconstruction meeting.
04/05/2024 COT - ENGR - Stormwater Passed
04/05/2024 COT - ENGR - Signage Final Passed
04/15/2024 SITE - Stormwater Follow-up Passed no construction occurring, gate installation only.
04/16/2024 ENGR - Drainage Structures Passed this inspection was for the bollards protecting the electrical gate access panel. the gate and any other issues that require inspection need to contact Building, spoke with Pete Lee with COT to confirm. this inspection “passed” was confirmed with Mr. David Robert’s.
04/16/2024 ENGR Engineering Final Passed this inspection was for the bollards protecting the electrical gate access panel. the gate and any other issues that require inspection need to contact Building, spoke with Pete Lee with COT to confirm. this inspection “passed” was confirmed with Mr. David Robert’s.

Documents

File Name Document Type  
APPROVED 3_PLAN SET - STONE POINT - DP - 2023-06-09_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW