Permit: TD-DEV-0423-00222
Permit Details
Apply Date:
04/25/2023
Applicant:
Andrew Denton
Description:
Addition of gate & fencing to existing multi-family project
Permit Reviews
Permit Number - TD-DEV-0423-00222
Permit Status: Complete
Permit Description: Addition of gate & fencing to existing multi-family project
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/12/2023 | DEVELOPMENT PACKAGE NEW v.1 | 07/07/2023 | APPROVED |
| 04/28/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 06/01/2023 | REQUIRES RESUBMIT |
| 04/25/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 04/26/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0423-00222
Permite Description: Addition of gate & fencing to existing multi-family project
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2024 | PDSD Site/Engineering Division - NPPO | N/A | Not Applicable | No NPPO changed or added per plan. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0423-00222
Permit Description: Addition of gate & fencing to existing multi-family project
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2024 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 04/05/2024 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
| 04/05/2024 | SITE | Passed | ||
| 04/05/2024 | SITE - Stormwater Final Inspection | Passed | ||
| 04/05/2024 | SITE - Stormwater Setup and Controls | Passed | ||
| 04/05/2024 | City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection | Passed | ||
| 04/05/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Work completed without preconstruction meeting. | |
| 04/05/2024 | COT - ENGR - Stormwater | Passed | ||
| 04/05/2024 | COT - ENGR - Signage Final | Passed | ||
| 04/15/2024 | SITE - Stormwater Follow-up | Passed | no construction occurring, gate installation only. | |
| 04/16/2024 | ENGR - Drainage Structures | Passed | this inspection was for the bollards protecting the electrical gate access panel. the gate and any other issues that require inspection need to contact Building, spoke with Pete Lee with COT to confirm. this inspection “passed” was confirmed with Mr. David Robert’s. | |
| 04/16/2024 | ENGR Engineering Final | Passed | this inspection was for the bollards protecting the electrical gate access panel. the gate and any other issues that require inspection need to contact Building, spoke with Pete Lee with COT to confirm. this inspection “passed” was confirmed with Mr. David Robert’s. |