Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 04/05/2024 |
ENGR - Drainage Structures |
|
Not Ready |
Work completed prior to inspection. Vehicular gate opening measures 19’4”. Plan specification 20’1”. |
| 04/15/2024 |
ENGR - Drainage Structures |
|
Passed |
this inspection was for the bollards protecting the electrical gate access panel. the gate and any other issues that require inspection need to contact Building, spoke with Pete Lee with COT to confirm. this inspection “passed” was confirmed with Mr. David Roberts. |
| 04/16/2024 |
ENGR - Drainage Structures |
|
Passed |
this inspection was for the bollards protecting the electrical gate access panel. the gate and any other issues that require inspection need to contact Building, spoke with Pete Lee with COT to confirm. this inspection “passed” was confirmed with Mr. David Robert’s. |