Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3760 N COMMERCE DR
Apply Date:
03/22/2024
Applicant:
Janice Lohman
Description:
Revision 1 - increase the depth of the loading docks ; Recreating the loading docks that had been previously covered over for additional parking. No expansion or increase in site area. Associated permit: TC-COM-1023-02495

Permit Reviews

Permit Number - TD-DEV-0324-00097
Permit Status: Complete
Permit Description: Revision 1 - increase the depth of the loading docks ; Recreating the loading docks that had been previously covered over for additional parking. No expansion or increase in site area. Associated permit: TC-COM-1023-02495
Start Date Submittal Complete Date Status  
03/22/2024 DEVELOPMENT PACKAGE NEW v.1 05/09/2024 APPROVED Review Details
10/31/2024 DEVELOPMENT PACKAGE NEW v.2 11/21/2024 APPROVED Review Details
10/01/2024 DEVELOPMENT PACKAGE NEW v.1 10/23/2024 REQUIRES RESUBMIT Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0324-00097
Permit Description: Revision 1 - increase the depth of the loading docks ; Recreating the loading docks that had been previously covered over for additional parking. No expansion or increase in site area. Associated permit: TC-COM-1023-02495
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/03/2025 PDSD Engineering Division Pre-Construction SITE Passed Request remaining inspections on Permit.
There is ADA Parking, striping and signage on the DP see keynotes on page 3. Also there is a parking space to right of the north dock that is to be striped as a loading area as well as long term Bike parking. I discussed this with the Contractor. He will be addressing this starting on Monday.
07/08/2025 SITE - Zoning Final Passed Zoning final is good. Dock ramps are located according to approved plans.
08/22/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.