Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TD-DEV-0324-00097
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2025 | ENGR Engineering Final | Not Ready | Parking lot restripe called out in development package has not been completed. Physical separation is required between parking spaces and sidewalk (curb, parking block, bollards, etc). | |
| 08/22/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. |