Permit: TD-DEV-0225-00052
Permit Details
Apply Date:
02/11/2025
Applicant:
Description:
Restricted Record - New landscape for existing San Miguel campus (site electrical by separate permit) / Site and Grading
Permit Reviews
Permit Number - TD-DEV-0225-00052
Permit Status: Complete
Permit Description: Restricted Record - New landscape for existing San Miguel campus (site electrical by separate permit) / Site and Grading
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/20/2025 | DEVELOPMENT PACKAGE NEW v.1 | 04/07/2025 | REQUIRES RESUBMIT |
| 04/21/2025 | DEVELOPMENT PACKAGE NEW v.2 | 05/15/2025 | APPROVED |
Conditions
Permit Number - TD-DEV-0225-00052
Permit Status: Complete
Permit Description: Restricted Record - New landscape for existing San Miguel campus (site electrical by separate permit) / Site and Grading
| Date | Description | Comments |
|---|---|---|
| 10/01/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0225-00052
Permit Description: Restricted Record - New landscape for existing San Miguel campus (site electrical by separate permit) / Site and Grading
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Pre-Construction meeting held on site. The scope of this project is primarily landscaping. Necessary inspections will include "engineering drainage structure" (for stormwater cells), "landscape irrigation", "landscape planting", "landscape appearance and function", "engineering final", and you can use "site consultation" if a generic site visit is needed. No NPPO for this site, no SWPPP for this site. Stormwater infiltration basins have been set in the ground but are not covered. Placement is good, drainpipe connecting units is good. | |
| 11/06/2025 | ENGR Engineering Final | Passed | Site is safe, accessible, and complete in accordance with approved plans. Engineering is okay for CofO. | |
| 11/06/2025 | SITE - Zoning Final | Passed | Site is complete in accordance with approved plans, zoning requirements are satisfied. |