Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 07/02/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
Pre-Construction meeting held on site. The scope of this project is primarily landscaping. Necessary inspections will include "engineering drainage structure" (for stormwater cells), "landscape irrigation", "landscape planting", "landscape appearance and function", "engineering final", and you can use "site consultation" if a generic site visit is needed. No NPPO for this site, no SWPPP for this site. Stormwater infiltration basins have been set in the ground but are not covered. Placement is good, drainpipe connecting units is good. |