Permit: TD-DEV-0224-00051
Permit Details
Apply Date:
02/15/2024
Applicant:
Carlos Flores
Description:
Revision 2 - Update to wall screen started 09.03.2025; REVISION 1 - Adding entry access to the north side of the building, including a new screen wall, a new sidewalk along rillito, upgrading electrical and mechanical systems as well as the sprinkler system.
Permit Reviews
Permit Number - TD-DEV-0224-00051
Permit Status: Complete
Permit Description: Revision 2 - Update to wall screen started 09.03.2025; REVISION 1 - Adding entry access to the north side of the building, including a new screen wall, a new sidewalk along rillito, upgrading electrical and mechanical systems as well as the sprinkler system.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/22/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 05/20/2025 | REQUIRES RESUBMIT |
| 04/03/2024 | DEVELOPMENT PACKAGE NEW v.2 | 05/10/2024 | APPROVED |
| 02/16/2024 | DEVELOPMENT PACKAGE NEW v.1 | 04/01/2024 | REQUIRES RESUBMIT |
| 09/03/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 09/18/2025 | APPROVED |
| 05/28/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 06/25/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0224-00051
Permite Description: Revision 2 - Update to wall screen started 09.03.2025; REVISION 1 - Adding entry access to the north side of the building, including a new screen wall, a new sidewalk along rillito, upgrading electrical and mechanical systems as well as the sprinkler system.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2024 | SITE | N/A | Not Ready | Contractors going to reschedule |
| 07/14/2025 | COT - ENGR - Stormwater | N/A | Complete (Recurring) | No concern at this time |
| 07/14/2025 | ENGR - Drainage Structures | N/A | Not Applicable | |
| 09/09/2025 | ENGR Grading Final | N/A | Partial Pass | Contractor for me for handicap parking on the south end of the building |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0224-00051
Permit Description: Revision 2 - Update to wall screen started 09.03.2025; REVISION 1 - Adding entry access to the north side of the building, including a new screen wall, a new sidewalk along rillito, upgrading electrical and mechanical systems as well as the sprinkler system.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Inform the contractor, if there’s any changes in this plants need to be submitted into the city. Looks like there’s a change on the sidewalk entrance on the north side. There’s a new cage added on that north side that was never inspected. | |
| 07/14/2025 | NPPO Pre-Construction | Passed | Contractor has changes on the north end of the building about a screen wall. Engineering record will submit something to the city on the changes. | |
| 09/19/2025 | ENGR Engineering Final | Passed |