Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Fees Paid
Type:
Development Package
Address NEW:
8650 E OLD VAIL RD
Apply Date:
02/06/2024
Applicant:
Blake Junak
Description:
Rev 1 - landscaping - started 11/4/2025 ** New industrial building

Permit Reviews

Permit Number - TD-DEV-0224-00040
Permit Status: Fees paid
Permit Description: Rev 1 - landscaping - started 11/4/2025 ** New industrial building
Start Date Submittal Complete Date Status  
10/23/2025 AS-BUILT v.1 11/03/2025 REQUIRES RESUBMIT Review Details
05/13/2024 DEVELOPMENT PACKAGE NEW v.2 06/14/2024 REQUIRES RESUBMIT Review Details
11/04/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 11/18/2025 REQUIRES RESUBMIT Review Details
06/18/2024 DEVELOPMENT PACKAGE NEW v.3 07/18/2024 APPROVED Review Details
02/07/2024 DEVELOPMENT PACKAGE NEW v.1 03/22/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0224-00040
Permit Status: Fees paid
Permit Description: Rev 1 - landscaping - started 11/4/2025 ** New industrial building
Total Outstanding Activity Conditions - 1
Date Name
10/01/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Fees Paid
Permit Number: TD-DEV-0224-00040
Permite Description: Rev 1 - landscaping - started 11/4/2025 ** New industrial building
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/22/2025 PDSD Engineering Division Pre-Construction SITE N/A Failed Pre-Construction Meeting is failed. A revision is required to address the non-compliance with the approved NPPO. Submit a revision including an NPPO Mitigation Plan. Joshua Garcia


Pre-construction meeting is complete. NOI and ROW permits are being worked on. Land clearing had taken place sometime in the past but after the NPPO was drawn up, the extent of impact is to be determined. Work will not begin until SWPPP measures are in place. Next steps: Stormwater Initial Inspection and NPPO Pre-Construction Inspection.

Documents

File Name Document Type  
APPROVED 3_PLAN SET - OLD VAIL INDUSTRIAL - DP - 2024-06-17_V3_V3.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COT PERMIT CARD.PDF DOCUMENTS VIEW
FACILITIESMAP.PDF DOCUMENTS VIEW
REDLINE.PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW