Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-0224-00040
Permit Details
Status:
Fees Paid
Type:
Development Package
Address:
8650 E OLD VAIL RD
Address NEW:
8650 E OLD VAIL RD
Apply Date:
02/06/2024
Applicant:
Blake Junak
Description:
Rev 1 - landscaping - started 11/4/2025 ** New industrial building
Permit Reviews
Permit Number - TD-DEV-0224-00040
Permit Status: Fees paid
Permit Description: Rev 1 - landscaping - started 11/4/2025 ** New industrial building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/23/2025 | AS-BUILT v.1 | 11/03/2025 | REQUIRES RESUBMIT |
| 05/13/2024 | DEVELOPMENT PACKAGE NEW v.2 | 06/14/2024 | REQUIRES RESUBMIT |
| 11/04/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 11/18/2025 | REQUIRES RESUBMIT |
| 06/18/2024 | DEVELOPMENT PACKAGE NEW v.3 | 07/18/2024 | APPROVED |
| 02/07/2024 | DEVELOPMENT PACKAGE NEW v.1 | 03/22/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-0224-00040
Permit Status: Fees paid
Permit Description: Rev 1 - landscaping - started 11/4/2025 ** New industrial building
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/01/2025 | CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT |
Outstanding Inspections
Permit Status: Fees Paid
Permit Number: TD-DEV-0224-00040
Permite Description: Rev 1 - landscaping - started 11/4/2025 ** New industrial building
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2025 | PDSD Engineering Division Pre-Construction SITE | N/A | Failed | Pre-Construction Meeting is failed. A revision is required to address the non-compliance with the approved NPPO. Submit a revision including an NPPO Mitigation Plan. Joshua Garcia Pre-construction meeting is complete. NOI and ROW permits are being worked on. Land clearing had taken place sometime in the past but after the NPPO was drawn up, the extent of impact is to be determined. Work will not begin until SWPPP measures are in place. Next steps: Stormwater Initial Inspection and NPPO Pre-Construction Inspection. |