Inspection History Details
Inspection Status: Failed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2025 | PDSD Engineering Division Pre-Construction SITE | Failed | Pre-Construction Meeting is failed. A revision is required to address the non-compliance with the approved NPPO. Submit a revision including an NPPO Mitigation Plan. Joshua Garcia Pre-construction meeting is complete. NOI and ROW permits are being worked on. Land clearing had taken place sometime in the past but after the NPPO was drawn up, the extent of impact is to be determined. Work will not begin until SWPPP measures are in place. Next steps: Stormwater Initial Inspection and NPPO Pre-Construction Inspection. |