Permit: TD-DEV-0223-00135
Permit Details
Apply Date:
02/13/2023
Applicant:
Nico Fricchione
Description:
REV - Two new drive-thru restaurants in Tucson Marketplace
Permit Reviews
Permit Number - TD-DEV-0223-00135
Permit Status: Issued
Permit Description: REV - Two new drive-thru restaurants in Tucson Marketplace
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/15/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 04/14/2023 | REQUIRES RESUBMIT |
07/21/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 09/05/2023 | APPROVED |
06/27/2023 | DEVELOPMENT PACKAGE NEW v.1 | 07/21/2023 | APPROVED |
05/17/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 06/15/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0223-00135
Permite Description: REV - Two new drive-thru restaurants in Tucson Marketplace
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/14/2023 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
12/14/2023 | NPPO Pre-Construction | N/A | Not Ready | |
12/14/2023 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | All setup and controls are in place and no concerns at this time. |
08/16/2024 | For trash and recycling enclosures | N/A | Partial Pass | pollard footers have been done, but none of the bollards have been permanently set in place preparing for the placement of concrete. The contractor will provide photos once they have set the bollards and are ready to pour the concrete. |
10/03/2024 | ENGR - Drainage Structures | N/A | Partial Pass | Passed head wall installation x 2, 10/03/24 |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0223-00135
Permit Description: REV - Two new drive-thru restaurants in Tucson Marketplace
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/28/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
05/23/2024 | SITE - Stormwater Follow-up | Passed | ||
09/19/2024 | City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection | Passed | ||
09/19/2024 | COT - SITE - Zoning Intermediate | Passed | ||
10/15/2024 | ENGR - Drainage Structures | Passed |