Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 09/24/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Ok to pour the head wall footers for both areas |
| 10/03/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Passed head wall installation x 2, 10/03/24 |
| 10/08/2024 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractors going to pour the floor for the catch basin on the north west corner of the building |
| 10/15/2024 |
ENGR - Drainage Structures |
|
Passed |
|
| 12/14/2023 |
ENGR - Drainage Structures |
|
Partial Pass |
Trash enclosure footers located at the NW corner of site are per COT requirements and ready for concrete pour. |