Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-0126-00008
Permit Details
Status:
Needs Resubmittal
Type:
Development Package
Address:
8755 S RITA RD
Address NEW:
8755 S RITA RD
Apply Date:
01/09/2026
Applicant:
Charlie Smith
Description:
This Development Package submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238. The proposed construction will consist of: 1. A new concrete slab with a protective canopy of approximately 18’ interior eave height to cover the wastewater process equipment. The sides of the canopy will be open air. 2. A new pre-engineered metal building (PEMB) approximately 45’x38’ (1,710 square feet) to house electrical equipment, blowers, and chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall. 4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab.
Permit Reviews
Permit Number - TD-DEV-0126-00008
Permit Status: Needs resubmittal
Permit Description: This Development Package submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238.
The proposed construction will consist of:
1. A new concrete slab with a protective canopy of approximately 18’ interior eave height to cover the wastewater process equipment. The sides of the canopy will be open air.
2. A new pre-engineered metal building (PEMB) approximately 45’x38’ (1,710 square feet) to house electrical equipment, blowers, and chemical dosing equipment.
3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall.
4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/12/2026 | DEVELOPMENT PACKAGE NEW v.1 | 01/14/2026 | REQUIRES RESUBMIT |