Permit: TD-DEV-0124-00002
Permit Details
Apply Date:
01/03/2024
Applicant:
Brian Hagedon
Description:
Update to the existing DP22-0085 for Change of Use from Bank to Retail Trade. GVR Ministries will be using the building to distribute donated food and clothing the needy in Tucson. The team has met with Elisa Hamblin an discussed this one page DP submission
Permit Reviews
Permit Number - TD-DEV-0124-00002
Permit Status: Complete
Permit Description: Update to the existing DP22-0085 for Change of Use from Bank to Retail Trade. GVR Ministries will be using the building to distribute donated food and clothing the needy in Tucson. The team has met with Elisa Hamblin an discussed this one page DP submission
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/09/2024 | DEVELOPMENT PACKAGE NEW v.1 | 02/16/2024 | REQUIRES RESUBMIT |
| 03/21/2024 | DEVELOPMENT PACKAGE NEW v.2 | 04/25/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0124-00002
Permite Description: Update to the existing DP22-0085 for Change of Use from Bank to Retail Trade. GVR Ministries will be using the building to distribute donated food and clothing the needy in Tucson. The team has met with Elisa Hamblin an discussed this one page DP submission
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2024 | For trash and recycling enclosures | N/A | Partial Pass | the next inspection should be the final. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0124-00002
Permit Description: Update to the existing DP22-0085 for Change of Use from Bank to Retail Trade. GVR Ministries will be using the building to distribute donated food and clothing the needy in Tucson. The team has met with Elisa Hamblin an discussed this one page DP submission
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | I met with a contractor on site and looked at the work that they were doing. They’re preparing to do sidewalks for the driveways within the right away. I have advised them to call Daniel Robertson and get the transportation approval before they look at pouring the sidewalk that they have formed. I also looked at the trash enclosure that has been dug in the northwest corner of the site. It appears to be ready to be poured for the footer, and then they will start the wall construction after that. I have advised the contractor to remind his subcontractor that they can build 4 foot of the wall and then they have to grout it and then they can complete the wall. If they choose to build all the wall, then they will have to make sure to provide witness holes at the bottom of the wall for every cell that has rebar in it. | |
| 10/10/2024 | For trash and recycling enclosures | Passed | ||
| 10/15/2024 | ENGR Engineering Final | Passed | CO Ready |