Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-0123-00094
Permit Details
Status:
Complete
Type:
Development Package
Address:
3100 E SPEEDWAY BL
Address NEW:
3100 E SPEEDWAY BL
Apply Date:
01/05/2023
Applicant:
Anthony Capps
Description:
*Revision #2 (landscape) started 5/22/2024* New Starbucks drive through restaurant in location of previous Native restaurant
Permit Reviews
Permit Number - TD-DEV-0123-00094
Permit Status: Complete
Permit Description: *Revision #2 (landscape) started 5/22/2024* New Starbucks drive through restaurant in location of previous Native restaurant
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/22/2024 | DEVELOPMENT PACKAGE NEW v.1 | 06/13/2024 | APPROVED |
| 04/12/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 05/15/2023 | APPROVED |
| 01/05/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 02/02/2023 | REQUIRES RESUBMIT |
| 01/02/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 02/21/2024 | APPROVED |
| 02/28/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 04/10/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0123-00094
Permite Description: *Revision #2 (landscape) started 5/22/2024* New Starbucks drive through restaurant in location of previous Native restaurant
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2023 | SITE - Stormwater Setup and Controls | N/A | Not Ready | Provide controls as needed |
| 10/27/2023 | PDSD Site/Engineering Division - NPPO | N/A | Partial Pass | |
| 04/02/2024 | COT - ENGR - Site - Assurance Release | N/A | Partial Pass | need clarification |
| 10/27/2023 | SITE - Stormwater Follow-up | N/A | Partial Pass | |
| 04/22/2024 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Partial Pass | water harvesting basins not deep enough, minimum 6-8 inches. |
| 04/22/2024 | SITE | N/A | Partial Pass | |
| 04/22/2024 | SITE - Stormwater Final Inspection | N/A | Partial Pass | |
| 04/22/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | |
| 07/25/2024 | ENGR Engineering Final | N/A | Partial Pass | Contractor needs to remove the fence. I do not see a short term bicycle parking. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0123-00094
Permit Description: *Revision #2 (landscape) started 5/22/2024* New Starbucks drive through restaurant in location of previous Native restaurant
Total Completed Inspections - 18