Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TD-DEV-0123-00094
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2024 | ENGR Engineering Final | Not Ready | west screen wall (by sidewalk) not per plan, suggest plan revision/COT approval, long term & short term bicycle parking not ready, ADA parking not to plan/code, East facing roof rainwater down spouts need to connect to scuppers in sidewalk, provide images of southeast roof surface draining to existing rainwater down spouts, west screen wall masonry footer, by drive through, has a deep depression creating a safety hazard. |
|
| 04/22/2024 | ENGR Engineering Final | Partial Pass | ADA parking not compliant with 2% slopes, roof drain down spouts east face of building, SE roof drainage is not clear, will discuss. |
|
| 04/29/2024 | ENGR Engineering Final | Partial Pass | ADA parking spaces still not 2% or under. | |
| 05/21/2024 | ENGR Engineering Final | Not Ready | ||
| 06/03/2024 | ENGR Engineering Final | Partial Pass | TC02, this job for all intents and purposes has been completed by Americo Builders on the exterior. Starbucks is responsible for all Starbucks signage on the exterior of the building, monument signs, directional signs etc. Once Starbucks is complete with all signage engineering can then sign off on the CO. |
|
| 07/25/2024 | ENGR Engineering Final | Partial Pass | Contractor needs to remove the fence. I do not see a short term bicycle parking. | |
| 08/01/2024 | ENGR Engineering Final | Passed |