Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-UTL-1222-00022
Permit Details
Apply Date:
12/05/2022
Applicant:
Kelly Taken
Description:
ATC 82456 - Verizon equipment upgrade on an existing commercial cell tower. Scope of work includes removing antennas, RRUs, and TMAs from the tower, and installing antennas, RRUs, and mount modifications. Scope of work also includes installing (1) C-Band BBU in the existing Verizon equipment shelter. There will be no change to the height of the tower or the size of the compound.
Permit Reviews
Permit Number - TC-UTL-1222-00022
Permit Status: Issued
Permit Description: ATC 82456 - Verizon equipment upgrade on an existing commercial cell tower. Scope of work includes removing antennas, RRUs, and TMAs from the tower, and installing antennas, RRUs, and mount modifications. Scope of work also includes installing (1) C-Band BBU in the existing Verizon equipment shelter. There will be no change to the height of the tower or the size of the compound.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/06/2022 | UTILITIES REVIEW v.1 | 01/03/2023 | APPROVED |
Conditions
Permit Number - TC-UTL-1222-00022
Permit Status: Issued
Permit Description: ATC 82456 - Verizon equipment upgrade on an existing commercial cell tower. Scope of work includes removing antennas, RRUs, and TMAs from the tower, and installing antennas, RRUs, and mount modifications. Scope of work also includes installing (1) C-Band BBU in the existing Verizon equipment shelter. There will be no change to the height of the tower or the size of the compound.
Date | Description | Comments |
---|---|---|
01/03/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-UTL-1222-00022
Permit Description: ATC 82456 - Verizon equipment upgrade on an existing commercial cell tower. Scope of work includes removing antennas, RRUs, and TMAs from the tower, and installing antennas, RRUs, and mount modifications. Scope of work also includes installing (1) C-Band BBU in the existing Verizon equipment shelter. There will be no change to the height of the tower or the size of the compound.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/02/2023 | COT - LCEL - Electrical Final | Passed | Approved and completed cell site upgrades | |
10/02/2023 | COT - LCBU - Building Final | Passed | Approved and completed cell site upgrades |