Permit: TC-UTL-0525-00037
Permit Details
Apply Date:
05/16/2025
Applicant:
Ashley Benjamin
Description:
Restricted Record - New Medical Office Building on existing lot
Permit Reviews
Permit Number - TC-UTL-0525-00037
Permit Status: Inspections
Permit Description: Restricted Record - New Medical Office Building on existing lot
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/09/2025 | PRIVATE UTILITY v.2 | 07/15/2025 | APPROVED |
| 05/16/2025 | PRIVATE UTILITY v.1 | 06/17/2025 | REQUIRES RESUBMIT |
| 07/15/2025 | RESTAMP - COMMERCIAL v.1 | 07/16/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-UTL-0525-00037
Permite Description: Restricted Record - New Medical Office Building on existing lot
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2025 | COT - HCPL - Gas Final | N/A | Partial Pass | 8-5-25: precon meeting to discuss construction expectations and procedures related to site utilities. |
| 08/11/2025 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 8-11-25: called point of contact at 9:17am and received no answer. Arrived on site at approximately 9:30 and did not locate contractor. I left the site at 9:53am. |
| 08/20/2025 | COT - HCPL - Plumbing Final | N/A | Partial Pass | private sewer. |
| 09/22/2025 | COT - LCEL - Electrical Progress | N/A | Not Ready | Wanted carport and charger conduits under South parking lot. |
| 09/30/2025 | COT - LCEL - Electrical Underground | N/A | Partial Pass | X6 1 1/4” schedule 40 feeding EV charging stations heading to new switch gear location. X5 1 1/4” separate trench heading towards new switch gear location. X1 1” is for future monument sign. East end of parking lot. Behind curb. All Stub up for future Ev chargers. Total of 11. Okay to backfill progress areas. 9/30/2025 |