Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-UTL-0425-00030
Permit Details
Apply Date:
04/26/2025
Applicant:
Andrew Agosto
Description:
AT&T equipment upgrade on existing Sooner wireless communication facility. AT&T is currently on Sooner Tower and would like to swap out its older Nokia equipment for upgraded Ericsson equipment to increase wireless reception in the area. The upgrade will not increase tower height, will not increase ground footprint or lease area, and will maintain current structure stealthing. Exact SOW is as follows: CHANGES ON THE EXISTING MONOPALM: · REMOVE (6) EXISTING ANTENNAS. · REMOVE ALL EXISTING NOKIA RADIOS. · REMOVE EXISTING TMAS · REMOVE EXISTING ANTENNA MOUNT · INSTALL NEW MSFAA PINCH RING · INSTALL NEW VFA6-HD ANTENNA MOUNT · INSTALL NEW 840-370966K ANTENNA ON P1 A/B/C · INSTALL NEW AIR6419 B77D+AIR6419 B77G STACKED ANTENNA ON P2 A/B/C · INSTALL NEW 840-370799K ANTENNA ON P3 A/B/C · INSTALL NEW 4490 B5/B12A & 4415 B30 RADIOS ON P1 A/B/C · INSTALL NEW 4478 B14 AND 4890 B25/B66 RADIOS ON P3 A/B/C · REUSE EXISTING DC AND FIBER TRUNKS. · INSTALL (1) NEW 24 PAIR FIBER · INSTALL (2) NEW 6AWG POWER TRUNK · INSTALL (1) NEW DC9-48-60-24-8C-EV (SQUID) CHANGES IN THE EXISTING AT&T EQUIPMENT ENCLOSURE AREA: · REMOVE ALL (E) NOKIA BBUS · INSTALL E// BBU'S (BBU INFORMATION TO BE FINALIZED PRIOR TO CONSTRUCTION) · INSTALL (1) SAU, (1) XMU, (2) 6651 & (1) 6610 IN NEW FLX42 PURCELL CABINET · INSTALL (1) NEW DC12-48-60-0-25E (OUTDOOR)
Permit Reviews
Permit Number - TC-UTL-0425-00030
Permit Status: Issued
Permit Description: AT&T equipment upgrade on existing Sooner wireless communication facility. AT&T is currently on Sooner Tower and would like to swap out its older Nokia equipment for upgraded Ericsson equipment to increase wireless reception in the area. The upgrade will not increase tower height, will not increase ground footprint or lease area, and will maintain current structure stealthing. Exact SOW is as follows:
CHANGES ON THE EXISTING MONOPALM:
· REMOVE (6) EXISTING ANTENNAS.
· REMOVE ALL EXISTING NOKIA RADIOS.
· REMOVE EXISTING TMAS
· REMOVE EXISTING ANTENNA MOUNT
· INSTALL NEW MSFAA PINCH RING
· INSTALL NEW VFA6-HD ANTENNA MOUNT
· INSTALL NEW 840-370966K ANTENNA ON P1 A/B/C
· INSTALL NEW AIR6419 B77D+AIR6419 B77G STACKED ANTENNA ON P2 A/B/C
· INSTALL NEW 840-370799K ANTENNA ON P3 A/B/C
· INSTALL NEW 4490 B5/B12A & 4415 B30 RADIOS ON P1 A/B/C
· INSTALL NEW 4478 B14 AND 4890 B25/B66 RADIOS ON P3 A/B/C
· REUSE EXISTING DC AND FIBER TRUNKS.
· INSTALL (1) NEW 24 PAIR FIBER
· INSTALL (2) NEW 6AWG POWER TRUNK
· INSTALL (1) NEW DC9-48-60-24-8C-EV (SQUID)
CHANGES IN THE EXISTING AT&T EQUIPMENT ENCLOSURE AREA:
· REMOVE ALL (E) NOKIA BBUS
· INSTALL E// BBU'S (BBU INFORMATION TO BE FINALIZED PRIOR TO CONSTRUCTION)
· INSTALL (1) SAU, (1) XMU, (2) 6651 & (1) 6610 IN NEW FLX42 PURCELL CABINET
· INSTALL (1) NEW DC12-48-60-0-25E (OUTDOOR)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/06/2025 | UTILITIES REVIEW v.1 | 06/10/2025 | APPROVED |
Conditions
Permit Number - TC-UTL-0425-00030
Permit Status: Issued
Permit Description: AT&T equipment upgrade on existing Sooner wireless communication facility. AT&T is currently on Sooner Tower and would like to swap out its older Nokia equipment for upgraded Ericsson equipment to increase wireless reception in the area. The upgrade will not increase tower height, will not increase ground footprint or lease area, and will maintain current structure stealthing. Exact SOW is as follows:
CHANGES ON THE EXISTING MONOPALM:
· REMOVE (6) EXISTING ANTENNAS.
· REMOVE ALL EXISTING NOKIA RADIOS.
· REMOVE EXISTING TMAS
· REMOVE EXISTING ANTENNA MOUNT
· INSTALL NEW MSFAA PINCH RING
· INSTALL NEW VFA6-HD ANTENNA MOUNT
· INSTALL NEW 840-370966K ANTENNA ON P1 A/B/C
· INSTALL NEW AIR6419 B77D+AIR6419 B77G STACKED ANTENNA ON P2 A/B/C
· INSTALL NEW 840-370799K ANTENNA ON P3 A/B/C
· INSTALL NEW 4490 B5/B12A & 4415 B30 RADIOS ON P1 A/B/C
· INSTALL NEW 4478 B14 AND 4890 B25/B66 RADIOS ON P3 A/B/C
· REUSE EXISTING DC AND FIBER TRUNKS.
· INSTALL (1) NEW 24 PAIR FIBER
· INSTALL (2) NEW 6AWG POWER TRUNK
· INSTALL (1) NEW DC9-48-60-24-8C-EV (SQUID)
CHANGES IN THE EXISTING AT&T EQUIPMENT ENCLOSURE AREA:
· REMOVE ALL (E) NOKIA BBUS
· INSTALL E// BBU'S (BBU INFORMATION TO BE FINALIZED PRIOR TO CONSTRUCTION)
· INSTALL (1) SAU, (1) XMU, (2) 6651 & (1) 6610 IN NEW FLX42 PURCELL CABINET
· INSTALL (1) NEW DC12-48-60-0-25E (OUTDOOR)
| Date | Description | Comments |
|---|---|---|
| 06/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |