Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Withdrawn
Type:
Utilities Permit
Address:
2010 W ANKLAM RD
Apply Date:
04/28/2023
Applicant:
Stacy Kubeldis
Description:
Changes to Existing Monopalm that includes replacing existing antennas and surge suppressors ($40,000.00) CHANGES ON THE EXISTING MONOPALM: · POSITION 3- REMOVE (1) ANTENNA PER SECTOR, (3) SECTOR, (3) TOTAL · POSITION 3- INSTALL (2) STACKED ANTENNA/RRH, PER SECTOR, (3) SECTOR, (6) TOTAL · INSTALL (1) DC9 SURGE SUPPRESSOR TOTAL · INSTALL (3) 6AWG DC TRUNK & (1) 24-PAIR FIBER TRUNK CHANGES IN THE EXISTING AT&T EQUIPMENT ENCLOSURE AREA: AC/DC SCOPE: DC POWER PLAN REVIEW: · SITE HAS AN EXISTING EMERSON 5100 -48VDC POWER PLANT OUTFITTED WITH (10) HE 2KW -48VDC RECTIFIERS [NEQ. 15930] & (0) HE 1.5KW -48VDC/+24VDC CONVERTER MODULES [NEQ.15929]. EXISTING RECTIFIERS ARE SUFFICIENT, NO CHANGES ARE NECESSARY TO THE EXISTING DC POWER PLANT. · DC BREAKERS: INSTALL THE FOLLOWING DC BREAKERS: · (3) 40A [NEQ. 00185] FOR NEW AEQK ANTENNAS · (3) 40A [NEQ. 00185] FOR NEW AEQU ANTENNAS BATTERY CHECK: · NO PERMANENT STANDBY GENERATOR, MINIMUM REQUIRED BATTERY BACKUP TIME IS 4.0 HOURS · SITE HAS (16) CELLS OF EXISTING MARATHON M12V180FT BATTERIES, WHICH ARE SUFFICIENT. FOUR BATTERY STRINGS WILL PROVIDE 4.12 HRS OF BATTERY RESERVE CAPACITY. A/C PANEL REVIEW: · SEE PANEL SCHEDULE · NO CHANGES ARE NECESSARY TO THE EXISTING AC POWER PANEL. EXISTING 200A ELECTRICAL SERVICE IS SUFFICIENT. HVAC UNITS: · WUC SITE, FACTORY-INSTALLED DC HEAT EXCHANGERS.

Permit Reviews

Permit Number - TC-UTL-0423-00063
Permit Status: Withdrawn
Permit Description: Changes to Existing Monopalm that includes replacing existing antennas and surge suppressors ($40,000.00) CHANGES ON THE EXISTING MONOPALM: · POSITION 3- REMOVE (1) ANTENNA PER SECTOR, (3) SECTOR, (3) TOTAL · POSITION 3- INSTALL (2) STACKED ANTENNA/RRH, PER SECTOR, (3) SECTOR, (6) TOTAL · INSTALL (1) DC9 SURGE SUPPRESSOR TOTAL · INSTALL (3) 6AWG DC TRUNK & (1) 24-PAIR FIBER TRUNK CHANGES IN THE EXISTING AT&T EQUIPMENT ENCLOSURE AREA: AC/DC SCOPE: DC POWER PLAN REVIEW: · SITE HAS AN EXISTING EMERSON 5100 -48VDC POWER PLANT OUTFITTED WITH (10) HE 2KW -48VDC RECTIFIERS [NEQ. 15930] & (0) HE 1.5KW -48VDC/+24VDC CONVERTER MODULES [NEQ.15929]. EXISTING RECTIFIERS ARE SUFFICIENT, NO CHANGES ARE NECESSARY TO THE EXISTING DC POWER PLANT. · DC BREAKERS: INSTALL THE FOLLOWING DC BREAKERS: · (3) 40A [NEQ. 00185] FOR NEW AEQK ANTENNAS · (3) 40A [NEQ. 00185] FOR NEW AEQU ANTENNAS BATTERY CHECK: · NO PERMANENT STANDBY GENERATOR, MINIMUM REQUIRED BATTERY BACKUP TIME IS 4.0 HOURS · SITE HAS (16) CELLS OF EXISTING MARATHON M12V180FT BATTERIES, WHICH ARE SUFFICIENT. FOUR BATTERY STRINGS WILL PROVIDE 4.12 HRS OF BATTERY RESERVE CAPACITY. A/C PANEL REVIEW: · SEE PANEL SCHEDULE · NO CHANGES ARE NECESSARY TO THE EXISTING AC POWER PANEL. EXISTING 200A ELECTRICAL SERVICE IS SUFFICIENT. HVAC UNITS: · WUC SITE, FACTORY-INSTALLED DC HEAT EXCHANGERS.
Start Date Submittal Complete Date Status  
06/14/2023 UTILITIES REVIEW v.3 07/17/2023 APPROVED Review Details
04/28/2023 UTILITIES REVIEW v.1 04/28/2023 REQUIRES RESUBMIT Review Details
05/04/2023 UTILITIES REVIEW v.2 06/06/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-UTL-0423-00063
Permit Status: Withdrawn
Permit Description: Changes to Existing Monopalm that includes replacing existing antennas and surge suppressors ($40,000.00) CHANGES ON THE EXISTING MONOPALM: · POSITION 3- REMOVE (1) ANTENNA PER SECTOR, (3) SECTOR, (3) TOTAL · POSITION 3- INSTALL (2) STACKED ANTENNA/RRH, PER SECTOR, (3) SECTOR, (6) TOTAL · INSTALL (1) DC9 SURGE SUPPRESSOR TOTAL · INSTALL (3) 6AWG DC TRUNK & (1) 24-PAIR FIBER TRUNK CHANGES IN THE EXISTING AT&T EQUIPMENT ENCLOSURE AREA: AC/DC SCOPE: DC POWER PLAN REVIEW: · SITE HAS AN EXISTING EMERSON 5100 -48VDC POWER PLANT OUTFITTED WITH (10) HE 2KW -48VDC RECTIFIERS [NEQ. 15930] & (0) HE 1.5KW -48VDC/+24VDC CONVERTER MODULES [NEQ.15929]. EXISTING RECTIFIERS ARE SUFFICIENT, NO CHANGES ARE NECESSARY TO THE EXISTING DC POWER PLANT. · DC BREAKERS: INSTALL THE FOLLOWING DC BREAKERS: · (3) 40A [NEQ. 00185] FOR NEW AEQK ANTENNAS · (3) 40A [NEQ. 00185] FOR NEW AEQU ANTENNAS BATTERY CHECK: · NO PERMANENT STANDBY GENERATOR, MINIMUM REQUIRED BATTERY BACKUP TIME IS 4.0 HOURS · SITE HAS (16) CELLS OF EXISTING MARATHON M12V180FT BATTERIES, WHICH ARE SUFFICIENT. FOUR BATTERY STRINGS WILL PROVIDE 4.12 HRS OF BATTERY RESERVE CAPACITY. A/C PANEL REVIEW: · SEE PANEL SCHEDULE · NO CHANGES ARE NECESSARY TO THE EXISTING AC POWER PANEL. EXISTING 200A ELECTRICAL SERVICE IS SUFFICIENT. HVAC UNITS: · WUC SITE, FACTORY-INSTALLED DC HEAT EXCHANGERS.
Total Outstanding Activity Conditions - 1
Date Name
07/17/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.

Documents

File Name Document Type  
B004 IT_CELL_TOWER_APP SIGNED_V1.PDF DOCUMENTS VIEW
B004_DE113 SA (78.5)_10111052_MRANM045488_3901A13637_5G_07.29.2022__V2.PDF DOCUMENTS VIEW
CONS-B004_PIMA COMMUNITY COLLEGE_REV 2_FCD_04.20.23_V1.PDF DOCUMENTS VIEW