Permit: TC-UTL-0423-00063
Permit Details
Apply Date:
04/28/2023
Applicant:
Stacy Kubeldis
Description:
Changes to Existing Monopalm that includes replacing existing antennas and surge suppressors ($40,000.00) CHANGES ON THE EXISTING MONOPALM: · POSITION 3- REMOVE (1) ANTENNA PER SECTOR, (3) SECTOR, (3) TOTAL · POSITION 3- INSTALL (2) STACKED ANTENNA/RRH, PER SECTOR, (3) SECTOR, (6) TOTAL · INSTALL (1) DC9 SURGE SUPPRESSOR TOTAL · INSTALL (3) 6AWG DC TRUNK & (1) 24-PAIR FIBER TRUNK CHANGES IN THE EXISTING AT&T EQUIPMENT ENCLOSURE AREA: AC/DC SCOPE: DC POWER PLAN REVIEW: · SITE HAS AN EXISTING EMERSON 5100 -48VDC POWER PLANT OUTFITTED WITH (10) HE 2KW -48VDC RECTIFIERS [NEQ. 15930] & (0) HE 1.5KW -48VDC/+24VDC CONVERTER MODULES [NEQ.15929]. EXISTING RECTIFIERS ARE SUFFICIENT, NO CHANGES ARE NECESSARY TO THE EXISTING DC POWER PLANT. · DC BREAKERS: INSTALL THE FOLLOWING DC BREAKERS: · (3) 40A [NEQ. 00185] FOR NEW AEQK ANTENNAS · (3) 40A [NEQ. 00185] FOR NEW AEQU ANTENNAS BATTERY CHECK: · NO PERMANENT STANDBY GENERATOR, MINIMUM REQUIRED BATTERY BACKUP TIME IS 4.0 HOURS · SITE HAS (16) CELLS OF EXISTING MARATHON M12V180FT BATTERIES, WHICH ARE SUFFICIENT. FOUR BATTERY STRINGS WILL PROVIDE 4.12 HRS OF BATTERY RESERVE CAPACITY. A/C PANEL REVIEW: · SEE PANEL SCHEDULE · NO CHANGES ARE NECESSARY TO THE EXISTING AC POWER PANEL. EXISTING 200A ELECTRICAL SERVICE IS SUFFICIENT. HVAC UNITS: · WUC SITE, FACTORY-INSTALLED DC HEAT EXCHANGERS.
Permit Reviews
Permit Number - TC-UTL-0423-00063
Permit Status: Withdrawn
Permit Description: Changes to Existing Monopalm that includes replacing existing antennas and surge suppressors ($40,000.00)
CHANGES ON THE EXISTING MONOPALM:
· POSITION 3- REMOVE (1) ANTENNA PER SECTOR, (3) SECTOR, (3) TOTAL
· POSITION 3- INSTALL (2) STACKED ANTENNA/RRH, PER SECTOR, (3) SECTOR, (6) TOTAL
· INSTALL (1) DC9 SURGE SUPPRESSOR TOTAL
· INSTALL (3) 6AWG DC TRUNK & (1) 24-PAIR FIBER TRUNK
CHANGES IN THE EXISTING AT&T EQUIPMENT ENCLOSURE AREA:
AC/DC SCOPE:
DC POWER PLAN REVIEW:
· SITE HAS AN EXISTING EMERSON 5100 -48VDC POWER PLANT OUTFITTED WITH (10) HE 2KW
-48VDC RECTIFIERS [NEQ. 15930] & (0) HE 1.5KW -48VDC/+24VDC CONVERTER MODULES
[NEQ.15929]. EXISTING RECTIFIERS ARE SUFFICIENT, NO CHANGES ARE NECESSARY TO THE
EXISTING DC POWER PLANT.
· DC BREAKERS: INSTALL THE FOLLOWING DC BREAKERS:
· (3) 40A [NEQ. 00185] FOR NEW AEQK ANTENNAS
· (3) 40A [NEQ. 00185] FOR NEW AEQU ANTENNAS
BATTERY CHECK:
· NO PERMANENT STANDBY GENERATOR, MINIMUM REQUIRED BATTERY BACKUP TIME IS 4.0 HOURS
· SITE HAS (16) CELLS OF EXISTING MARATHON M12V180FT BATTERIES, WHICH ARE SUFFICIENT.
FOUR BATTERY STRINGS WILL PROVIDE 4.12 HRS OF BATTERY RESERVE CAPACITY.
A/C PANEL REVIEW:
· SEE PANEL SCHEDULE
· NO CHANGES ARE NECESSARY TO THE EXISTING AC POWER PANEL. EXISTING 200A ELECTRICAL
SERVICE IS SUFFICIENT.
HVAC UNITS:
· WUC SITE, FACTORY-INSTALLED DC HEAT EXCHANGERS.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/14/2023 | UTILITIES REVIEW v.3 | 07/17/2023 | APPROVED |
04/28/2023 | UTILITIES REVIEW v.1 | 04/28/2023 | REQUIRES RESUBMIT |
05/04/2023 | UTILITIES REVIEW v.2 | 06/06/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-UTL-0423-00063
Permit Status: Withdrawn
Permit Description: Changes to Existing Monopalm that includes replacing existing antennas and surge suppressors ($40,000.00)
CHANGES ON THE EXISTING MONOPALM:
· POSITION 3- REMOVE (1) ANTENNA PER SECTOR, (3) SECTOR, (3) TOTAL
· POSITION 3- INSTALL (2) STACKED ANTENNA/RRH, PER SECTOR, (3) SECTOR, (6) TOTAL
· INSTALL (1) DC9 SURGE SUPPRESSOR TOTAL
· INSTALL (3) 6AWG DC TRUNK & (1) 24-PAIR FIBER TRUNK
CHANGES IN THE EXISTING AT&T EQUIPMENT ENCLOSURE AREA:
AC/DC SCOPE:
DC POWER PLAN REVIEW:
· SITE HAS AN EXISTING EMERSON 5100 -48VDC POWER PLANT OUTFITTED WITH (10) HE 2KW
-48VDC RECTIFIERS [NEQ. 15930] & (0) HE 1.5KW -48VDC/+24VDC CONVERTER MODULES
[NEQ.15929]. EXISTING RECTIFIERS ARE SUFFICIENT, NO CHANGES ARE NECESSARY TO THE
EXISTING DC POWER PLANT.
· DC BREAKERS: INSTALL THE FOLLOWING DC BREAKERS:
· (3) 40A [NEQ. 00185] FOR NEW AEQK ANTENNAS
· (3) 40A [NEQ. 00185] FOR NEW AEQU ANTENNAS
BATTERY CHECK:
· NO PERMANENT STANDBY GENERATOR, MINIMUM REQUIRED BATTERY BACKUP TIME IS 4.0 HOURS
· SITE HAS (16) CELLS OF EXISTING MARATHON M12V180FT BATTERIES, WHICH ARE SUFFICIENT.
FOUR BATTERY STRINGS WILL PROVIDE 4.12 HRS OF BATTERY RESERVE CAPACITY.
A/C PANEL REVIEW:
· SEE PANEL SCHEDULE
· NO CHANGES ARE NECESSARY TO THE EXISTING AC POWER PANEL. EXISTING 200A ELECTRICAL
SERVICE IS SUFFICIENT.
HVAC UNITS:
· WUC SITE, FACTORY-INSTALLED DC HEAT EXCHANGERS.
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
07/17/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. |