Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-UTL-0324-00008
Permit Details
Apply Date:
03/18/2024
Applicant:
James Rogers
Description:
This property is currently being developed for a surface parking lot (no building-no structures) COT DP21-0034. I want to add Dusk to Dawn (D2D) site lighting to the parking area. Tucson Electric Power (TEP) has provided the design & engineering. TEP will provide all poles, fixtures, equipment, apparatuses and installation for a complete working D2D system. The D2D system is owned & maintained by TEP and leased to owner. Owner does not own the system-Tucson Power does.
Permit Reviews
Permit Number - TC-UTL-0324-00008
Permit Status: Complete
Permit Description: This property is currently being developed for a surface parking lot (no building-no structures) COT DP21-0034. I want to add Dusk to Dawn (D2D) site lighting to the parking area. Tucson Electric Power (TEP) has provided the design & engineering. TEP will provide all poles, fixtures, equipment, apparatuses and installation for a complete working D2D system. The D2D system is owned & maintained by TEP and leased to owner. Owner does not own the system-Tucson Power does.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/10/2024 | PRIVATE UTILITY v.2 | 07/01/2024 | REQUIRES RESUBMIT |
| 03/18/2024 | PRIVATE UTILITY v.1 | 04/16/2024 | REQUIRES RESUBMIT |
| 07/15/2024 | PRIVATE UTILITY v.3 | 08/14/2024 | APPROVED |
| 08/14/2024 | RESTAMP - COMMERCIAL v.1 | 08/15/2024 | APPROVED |
Conditions
Permit Number - TC-UTL-0324-00008
Permit Status: Complete
Permit Description: This property is currently being developed for a surface parking lot (no building-no structures) COT DP21-0034. I want to add Dusk to Dawn (D2D) site lighting to the parking area. Tucson Electric Power (TEP) has provided the design & engineering. TEP will provide all poles, fixtures, equipment, apparatuses and installation for a complete working D2D system. The D2D system is owned & maintained by TEP and leased to owner. Owner does not own the system-Tucson Power does.
| Date | Description | Comments |
|---|---|---|
| 03/18/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-UTL-0324-00008
Permite Description: This property is currently being developed for a surface parking lot (no building-no structures) COT DP21-0034. I want to add Dusk to Dawn (D2D) site lighting to the parking area. Tucson Electric Power (TEP) has provided the design & engineering. TEP will provide all poles, fixtures, equipment, apparatuses and installation for a complete working D2D system. The D2D system is owned & maintained by TEP and leased to owner. Owner does not own the system-Tucson Power does.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 02/03/2025 | PDSD Building Division - TEP PM Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-UTL-0324-00008
Permit Description: This property is currently being developed for a surface parking lot (no building-no structures) COT DP21-0034. I want to add Dusk to Dawn (D2D) site lighting to the parking area. Tucson Electric Power (TEP) has provided the design & engineering. TEP will provide all poles, fixtures, equipment, apparatuses and installation for a complete working D2D system. The D2D system is owned & maintained by TEP and leased to owner. Owner does not own the system-Tucson Power does.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2024 | COT - LCEL - Electrical Final | Passed | 12-19-24, 14 dusk to dawn poles were installed throughout site . Electrical final approved. | |
| 02/03/2025 | COT - LCEL - Electrical Progress | Passed | ||
| 02/03/2025 | COT - LCEL - Electrical Underground | Passed | ||
| 02/03/2025 | COT - LCEL - Outdoor Lighting | Passed | ||
| 02/03/2025 | SITE - Zoning Final | Passed | No issues seen |