Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel14103037B
JurisdictionTucson
City of Tucson ZoningI-1
Airport Environs Zone

NCD-B Davis Monthan AEZ Paddle

,

Tucson International AEZ Paddle

Tucson WardWard 4
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Permits

Address: 6991 E OLD VAIL RD
Date - 11/23/2024 2:58 p.m.
Total Number Of Permits - (8)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-0924-01074 Inspections 09/18/2024 10/25/2024 Right-of-Way (ROW) *Revision #2 started 7/26/2024* Site/Grading/Swppp - Old Vail Road RV Storage. Applying for ROW Permit to construct paving improvements for main entrance from Old Vail Road into project.
TC-UTL-0924-00082 Needs Resubmittal 09/11/2024 03/10/2025 Utilities Permit *Revision #2 started 7/26/2024* Site/Grading/Swppp - Old Vail Road RV Storage. I need a permit to install a 1 inch PVC water line connected to an existing water meter for domestic use/purposes for hose bibs on my project. The waterline will connect to a care takers mobile home in the future. The care takers mobile home will be permitted through the COT in the future at the time we are ready to install. The PVC waterline is shown on my APPROVED Development Plan number DP21-0034 and the care taker mobile home location is also shown on the APPROVED Development plan.
TC-COM-0624-01133 Inspections Complete 06/12/2024 05/05/2025 Commercial Building New 200 amp service. There are no building structures. New service will support controlled entry gate system and security camera system.
TC-COM-0624-01087 Void 06/05/2024 12/02/2024 Commercial Building VOIDED USE PERMIT TC-UTL-0324-00008 This permit is for a new 200 A electric service panel to the site. The site is being developed under DP21-0034 and is currently under construction. There are no building structures on the project. This electric service will support no building structure improvements permitted on the site per the development plan. TEP will be installing a new primary electric & transformer to the site. TEP approved primary electric plan is attached for your reference. TEP will install secondary electric, primary electric and transformer once we obtain a permit for new service panel and the new service panel is approved by COT Building Inspector.
TC-UTL-0324-00008 Issued 03/18/2024 02/17/2025 Utilities Permit This property is currently being developed for a surface parking lot (no building-no structures) COT DP21-0034. I want to add Dusk to Dawn (D2D) site lighting to the parking area. Tucson Electric Power (TEP) has provided the design & engineering. TEP will provide all poles, fixtures, equipment, apparatuses and installation for a complete working D2D system. The D2D system is owned & maintained by TEP and leased to owner. Owner does not own the system-Tucson Power does.
TC-COM-0324-00475 Void 03/17/2024 09/13/2024 Commercial Building VOIDED NEED TO SUBMIT AS A SUB RECORD TO YOUR DP PERMIT Project is being developed as surface parking (no building-no structures) Permit to add Dusk 2 Dawn site lighting to the area. TEP has provided engineering & design. TEP will provide all poles, fixtures, wire, equipment, apparatuses and installation for a complete working system. Dusk 2 Dawn system will be owned and maintained by TEP and leased to property owner. Owner does not own the system-Tucson Electric power does.
TC-COM-0324-00464 Void 03/15/2024 09/11/2024 Commercial Building VOIDED NEED TO SUBMIT AS A SUB RECORD TO YOUR DP PERMIT This property is currently being developed for surface parking (no building or structures) COT DP21-0034. I want to add Dusk 2 Dawn site lighting to the area. TEP has provided engineering & design. TEP will provide all poles, equipment, apparatuses and installation for a complete working system. The Dusk 2 Dawn system is owned & maintained by TEP and leased to owner. Owner does not own the system-Tucson electric Power does.
DP21-0034 Issued 02/08/2021 10/04/2027 Development Package *Revision #2 started 7/26/2024* Site/Grading/Swppp - Old Vail Road RV Storage.

Plans

Address: 6991 E OLD VAIL RD
Date - 11/23/2024 2:58 p.m.
Total Number Of Plans - (5)
Plan Number Status Application Date Exp Date Unit Type Description
TE-BAS-0424-00042 In Review 04/26/2024 N/A -- Stormwater Basin Retention/Detention Basin
TE-BAS-0623-00022 Approved 06/23/2023 N/A -- Commercial Water Harvesting Ordinance Site/Grading/Swppp - Old Vail Road RV Storage.
TW-WCP-0223-00053 Void 02/02/2023 02/02/2024 -- Water Design Plan VOID 5th Design plan submittal of the project plan number TW-WCP-0123-0037 (Formally DP1722)
TW-WCP-0223-00054 Void 02/02/2023 02/02/2024 -- Water Design Plan VOID 5th Submittal of the Old Vail Road Development Water Plan TW-WCP-1222-00037
TW-WCP-1222-00037 Accepted 12/23/2022 04/25/2024 -- Water Design Plan Old Vail Rd Development - PN 2-071-2021

Record Requests

Address: 6991 E OLD VAIL RD
Date - 11/23/2024 2:58 p.m.
Total Number Of Requests - (2)
Request Number Status Request Date Completed Date Type Description
REQ-0224-01616 Submitted - Online 02/27/2024 N/A Requests Old Vail Rd Development -DP1722- Rev1 (including air relief value) Design Plan submittal to TW for PN 2-071-2021 -
REQ-0623-03487 Approved 06/23/2023 07/06/2023 Requests Site/Grading/Swppp - Old Vail Road RV Storage.