Permit: TC-SOL-1125-01484
Permit Details
Apply Date:
11/09/2025
Applicant:
David Hosking
Description:
Rooftop Solar
Permit Reviews
Permit Number - TC-SOL-1125-01484
Permit Status: Inspections
Permit Description: Rooftop Solar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/10/2025 | RESIDENTIAL SOLAR APP v.1 | 11/10/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-SOL-1125-01484
Permite Description: Rooftop Solar
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/09/2025 | BULD - Electrical Clearance | N/A | Partial Pass | ESS is too far away from Disconnect and not within line of sight. See notes below: A readily accessible disconnect shall be provided within sight of the ESS [NEC 706.7(A)] Where remote actuation of the disconnecting means is employed the controls are not within sight of the ESS, the disconnecting means shall be capable of being locked in the open position. [NEC 706.7(B); 110.25] Where ESS input and output terminals are more than 5ft from connected equipment, or where circuits from these terminals pass through a wall or partition;- A disconnecting means is required at the ESS end of the circuit- If this disconnect is not within sight of the connected equipment a second disconnecting means is required at the connected equipment. [NEC 706.7(E)(1); 706.7(E)(2)] The disconnecting means for the ESS shall be legibly marked with the nominal ESS voltage, the maximum available fault current from the ESS and the associated clearing time, and the date the calculation was performed. [NEC 706.7 |
| 12/09/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-1125-01484
Permit Description: Rooftop Solar
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2026 | BULD - Electrical Clearance | Passed | 1.7.26 Cleared for DGC clearance |
|
| 01/07/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 1.7.26 Approved |