Permit: TC-SOL-1026-00588
Permit Details
Apply Date:
10/20/2026
Applicant:
TFS Solar
Description:
Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Permit Reviews
Permit Number - TC-SOL-1026-00588
Permit Status: Inspections
Permit Description: Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/20/2026 | RESIDENTIAL SOLAR APP v.1 | N/A | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-SOL-1026-00588
Permite Description: Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2026 | BULD - Electrical Clearance | N/A | Not Ready | 11-17-26 Reschedule inspection for DGL meter socket . Reschedule power kill per TEP. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-1026-00588
Permit Description: Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 11-19-26 Verbal given to TEP at 10:38am MSA DGL clearance approved. Solar Pv system inspected, new solar new battery, installed per plan. Approve clearance for DGC/BAT |
|
| 11/19/2026 | BULD - Electrical Clearance | Passed | 11-19-26 Verbal given to TEP at 10:38am MSA DGL clearance approved. Solar Pv system inspected, new solar new battery, installed per plan. Approve clearance for DGC/BAT |