Permit Details

Status:
Inspections
Type:
Solar
Address NEW:
3552 W FOXES MEADOW DR
Apply Date:
10/20/2026
Applicant:
TFS Solar
Description:
Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.

Permit Reviews

Permit Number - TC-SOL-1026-00588
Permit Status: Inspections
Permit Description: Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Start Date Submittal Complete Date Status  
10/20/2026 RESIDENTIAL SOLAR APP v.1 N/A APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-1026-00588
Permite Description: Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/17/2026 BULD - Electrical Clearance N/A Not Ready 11-17-26 Reschedule inspection for DGL meter socket .
Reschedule power kill per TEP.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-1026-00588
Permit Description: Roof mount 6.09 kW DC photovoltaic solar system; 14 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/19/2026 COT - RSOL - Electrical Final Solar Project Passed 11-19-26 Verbal given to TEP at 10:38am MSA DGL clearance approved.
Solar Pv system inspected, new solar new battery, installed per plan. Approve clearance for DGC/BAT
11/19/2026 BULD - Electrical Clearance Passed 11-19-26 Verbal given to TEP at 10:38am MSA DGL clearance approved.
Solar Pv system inspected, new solar new battery, installed per plan. Approve clearance for DGC/BAT

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-LLEWELLYN STEVEN PV2 STORAGE-DRAWINGS-3552-FOXES MEADOW-DR_V1.PDF DOCUMENTS VIEW
LLEWELLYN STEVEN PV2 STORAGE-SAPP APPROVAL-DOCUMENT-SA20261020-9-571-30-A_V1.PDF DOCUMENTS VIEW
LLEWELLYN STEVEN PV2 STORAGE-SPECS APPROVAL-UPLOADS-SA20261020-9-571-30-A_V1.PDF DOCUMENTS VIEW