Permit: TC-SOL-1025-01375
Permit Details
Apply Date:
10/10/2025
Applicant:
Marytine Ramos
Description:
REV. 1: 01/09/2026 Holdcraft PV System
Permit Reviews
Permit Number - TC-SOL-1025-01375
Permit Status: Inspections
Permit Description: REV. 1: 01/09/2026
Holdcraft PV System
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/09/2026 | RESIDENTIAL SOLAR REVISION v.1 | 01/09/2026 | REQUIRES RESUBMIT |
| 10/13/2025 | RESIDENTIAL SOLAR APP v.1 | 10/13/2025 | APPROVED |
| 01/09/2026 | RESIDENTIAL SOLAR REVISION v.2 | 01/09/2026 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-SOL-1025-01375
Permite Description: REV. 1: 01/09/2026
Holdcraft PV System
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 12/08/2025 Clearance TEP INCR for 200A MPU cutover. Partial pending solar final. |
| 12/24/2025 | COT - RSOL - Electrical Final Solar Project | N/A | Not Ready | 12/24/2025. Not ready install not per plan. Provide a revision or corrections need to be made in the field. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-1025-01375
Permit Description: REV. 1: 01/09/2026
Holdcraft PV System
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2026 | BULD - Electrical Clearance | Passed | 02/02/2026 Clearance TEP DGC/BAT. Verified revision and Solarapp Checklist dated 1/9/26 matches field installation. |
|
| 02/02/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 02/02/2026 Clearance TEP DGC/BAT. Verified revision and Solarapp Checklist dated 1/9/26 matches field installation. |