Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2026 | BULD - Electrical Clearance | Passed | 02/02/2026 Clearance TEP DGC/BAT. Verified revision and Solarapp Checklist dated 1/9/26 matches field installation. |
|
| 12/08/2025 | BULD - Electrical Clearance | Partial Pass | 12/08/2025 Clearance TEP INCR for 200A MPU cutover. Partial pending solar final. |
|
| 12/24/2025 | BULD - Electrical Clearance | Not Ready | 12/24/2025. Not ready install not per plan. Provide a revision or corrections need to be made in the field. |