Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections
Type:
Solar
Address NEW:
7818 E ROSEWOOD ST
Apply Date:
08/18/2025
Applicant:
Jamie Sue Housley
Description:
REV. 2: 12/11/2025 REV. 1: 11/07/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 16 MODULES - SYSTEM SIZE STC (6.56 kW DC / 6.00 kW AC)

Permit Reviews

Permit Number - TC-SOL-0825-01105
Permit Status: Inspections
Permit Description: REV. 2: 12/11/2025 REV. 1: 11/07/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 16 MODULES - SYSTEM SIZE STC (6.56 kW DC / 6.00 kW AC)
Start Date Submittal Complete Date Status  
08/18/2025 RESIDENTIAL SOLAR APP v.1 08/18/2025 APPROVED Review Details
12/08/2025 RESIDENTIAL SOLAR REVISION v.1 12/08/2025 REQUIRES RESUBMIT Review Details
12/11/2025 RESIDENTIAL SOLAR REVISION v.2 12/11/2025 APPROVED Review Details
11/07/2025 RESIDENTIAL SOLAR REVISION v.1 11/07/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0825-01105
Permite Description: REV. 2: 12/11/2025 REV. 1: 11/07/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 16 MODULES - SYSTEM SIZE STC (6.56 kW DC / 6.00 kW AC)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/08/2025 BULD - Electrical Clearance N/A Re-inspection required 12/08/2025
Requires uploaded revision letter stating change of work with SolarApp checklist/plans and inspection photos clearly displaying wire sizes.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0825-01105
Permit Description: REV. 2: 12/11/2025 REV. 1: 11/07/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 16 MODULES - SYSTEM SIZE STC (6.56 kW DC / 6.00 kW AC)
Total Completed Inspections - 2
Date Description Inspector Results Comments
12/12/2025 BULD - Electrical Clearance Passed 12/09/2025
Clearance to TEP DGC. Approved again, verified updated plans and checklist with photos in field - reviewer approved too.
12/12/2025 COT - RSOL - Electrical Final Solar Project Passed 12/12/2025
Clearance to TEP DGC. Approved again, verified updated plans and checklist with photos in field - reviewer approved too.