Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2025 | BULD - Electrical Clearance | Re-inspection required | 12/08/2025 Requires uploaded revision letter stating change of work with SolarApp checklist/plans and inspection photos clearly displaying wire sizes. |
|
| 12/09/2025 | BULD - Electrical Clearance | Passed | 12/09/2025 Clearance to TEP DGC. |
|
| 12/12/2025 | BULD - Electrical Clearance | Passed | 12/09/2025 Clearance to TEP DGC. Approved again, verified updated plans and checklist with photos in field - reviewer approved too. |