Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Solar
Address NEW:
7818 E ROSEWOOD ST
Apply Date:
08/18/2025
Applicant:
MATT Davis
Description:
REV. 2: 12/11/2025 REV. 1: 11/07/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 16 MODULES - SYSTEM SIZE STC (6.56 kW DC / 6.00 kW AC)

Permit Reviews

Permit Number - TC-SOL-0825-01105
Permit Status: Inspections
Permit Description: REV. 2: 12/11/2025 REV. 1: 11/07/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 16 MODULES - SYSTEM SIZE STC (6.56 kW DC / 6.00 kW AC)
Start Date Submittal Complete Date Status  
08/18/2025 RESIDENTIAL SOLAR APP v.1 08/18/2025 APPROVED Review Details
12/08/2025 RESIDENTIAL SOLAR REVISION v.1 12/08/2025 REQUIRES RESUBMIT Review Details
12/11/2025 RESIDENTIAL SOLAR REVISION v.2 12/11/2025 APPROVED Review Details
11/07/2025 RESIDENTIAL SOLAR REVISION v.1 11/07/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0825-01105
Permite Description: REV. 2: 12/11/2025 REV. 1: 11/07/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 16 MODULES - SYSTEM SIZE STC (6.56 kW DC / 6.00 kW AC)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/08/2025 BULD - Electrical Clearance N/A Re-inspection required 12/08/2025
Requires uploaded revision letter stating change of work with SolarApp checklist/plans and inspection photos clearly displaying wire sizes.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0825-01105
Permit Description: REV. 2: 12/11/2025 REV. 1: 11/07/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 16 MODULES - SYSTEM SIZE STC (6.56 kW DC / 6.00 kW AC)
Total Completed Inspections - 2
Date Description Inspector Results Comments
12/12/2025 BULD - Electrical Clearance Passed 12/09/2025
Clearance to TEP DGC. Approved again, verified updated plans and checklist with photos in field - reviewer approved too.
12/12/2025 COT - RSOL - Electrical Final Solar Project Passed 12/12/2025
Clearance to TEP DGC. Approved again, verified updated plans and checklist with photos in field - reviewer approved too.

Documents

File Name Document Type  
APPROVAL-DOCUMENT-SA20250818-9-1119-455-C_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-JACKIE LAWRENCE UPDATED PLANS_V1.PDF DOCUMENTS VIEW
JACKIE LAWRENCE INSPECTION PHOTO_V1.PDF DOCUMENTS VIEW
PERMIT RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
APPROVAL-DOCUMENT-SA20250818-9-1119-455-B_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-DOCUMENTS_V3_DRAWING-SET_JACQULINE LAWRENCE_V4_PLANS (2)_V1.PDF DOCUMENTS VIEW
APPROVAL-DOCUMENT-SA20250818-9-1119-455-A_V1.PDF DOCUMENTS VIEW
APPROVAL-UPLOADS-SA20250818-9-1119-455-A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PERMIT FOR - JACQUELINE LAWRENCE - 08-12-2025_V1.PDF DOCUMENTS VIEW