Permit: TC-SOL-0825-01105
Permit Details
Apply Date:
08/18/2025
Applicant:
MATT Davis
Description:
REV. 2: 12/11/2025 REV. 1: 11/07/2025 PHOTOVOLTAIC ROOF MOUNT SYSTEM 16 MODULES - SYSTEM SIZE STC (6.56 kW DC / 6.00 kW AC)
Permit Reviews
Permit Number - TC-SOL-0825-01105
Permit Status: Inspections
Permit Description: REV. 2: 12/11/2025
REV. 1: 11/07/2025
PHOTOVOLTAIC ROOF MOUNT SYSTEM
16 MODULES - SYSTEM SIZE STC (6.56 kW DC / 6.00 kW AC)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/18/2025 | RESIDENTIAL SOLAR APP v.1 | 08/18/2025 | APPROVED |
| 12/08/2025 | RESIDENTIAL SOLAR REVISION v.1 | 12/08/2025 | REQUIRES RESUBMIT |
| 12/11/2025 | RESIDENTIAL SOLAR REVISION v.2 | 12/11/2025 | APPROVED |
| 11/07/2025 | RESIDENTIAL SOLAR REVISION v.1 | 11/07/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0825-01105
Permite Description: REV. 2: 12/11/2025
REV. 1: 11/07/2025
PHOTOVOLTAIC ROOF MOUNT SYSTEM
16 MODULES - SYSTEM SIZE STC (6.56 kW DC / 6.00 kW AC)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 12/08/2025 Requires uploaded revision letter stating change of work with SolarApp checklist/plans and inspection photos clearly displaying wire sizes. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0825-01105
Permit Description: REV. 2: 12/11/2025
REV. 1: 11/07/2025
PHOTOVOLTAIC ROOF MOUNT SYSTEM
16 MODULES - SYSTEM SIZE STC (6.56 kW DC / 6.00 kW AC)
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2025 | BULD - Electrical Clearance | Passed | 12/09/2025 Clearance to TEP DGC. Approved again, verified updated plans and checklist with photos in field - reviewer approved too. |
|
| 12/12/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 12/12/2025 Clearance to TEP DGC. Approved again, verified updated plans and checklist with photos in field - reviewer approved too. |