Permit: TC-SOL-0825-01055
Permit Details
Apply Date:
08/06/2025
Applicant:
Project Manager
Description:
Rev. 2: 09/19/2025 -- Rev. 1: 09/09/2025 -- Installation of a 6.225kw dc system/1 Tesla Battery
Permit Reviews
Permit Number - TC-SOL-0825-01055
Permit Status: Complete
Permit Description: Rev. 2: 09/19/2025 --
Rev. 1: 09/09/2025 --
Installation of a 6.225kw dc system/1 Tesla Battery
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/09/2025 | RESIDENTIAL SOLAR REVISION v.1 | 09/09/2025 | APPROVED |
| 09/19/2025 | RESIDENTIAL SOLAR REVISION v.1 | 09/19/2025 | APPROVED |
| 08/06/2025 | RESIDENTIAL SOLAR APP v.1 | 08/06/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0825-01055
Permit Description: Rev. 2: 09/19/2025 --
Rev. 1: 09/09/2025 --
Installation of a 6.225kw dc system/1 Tesla Battery
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 9.22.2025 Verified wire/conduit schedule per plan and received photos of solid surfaced placed under Tesla PW3 per 9.11.2025 inspection. |
|
| 09/22/2025 | BULD - Electrical Clearance | Passed | 9.22.2025 Clearance for TEP DGC/BAT. |