Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSOL - Electrical Final Solar Project
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2025 | COT - RSOL - Electrical Final Solar Project | Re-inspection required | Fail per pics, PW3 inverter shall be placed over a solid surface to prevent foliage growth per installation manual, also please for future, provide clarity of wire sizes to the equipment | |
| 09/22/2025 | COT - RSOL - Electrical Final Solar Project | Passed | 9.22.2025 Verified wire/conduit schedule per plan and received photos of solid surfaced placed under Tesla PW3 per 9.11.2025 inspection. |