Permit: TC-SOL-0625-00757
Permit Details
Apply Date:
06/05/2025
Applicant:
Marytine Ramos
Description:
Rev. 2: 08/18/2025 -- Installation of a 7.38kw PV System with SolarEdge Battery with 225A MPU
Permit Reviews
Permit Number - TC-SOL-0625-00757
Permit Status: Complete
Permit Description: Rev. 2: 08/18/2025 --
Installation of a 7.38kw PV System with SolarEdge Battery with 225A MPU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/18/2025 | RESIDENTIAL SOLAR REVISION v.1 | 08/18/2025 | APPROVED |
| 06/05/2025 | RESIDENTIAL SOLAR APP v.1 | 06/05/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0625-00757
Permite Description: Rev. 2: 08/18/2025 --
Installation of a 7.38kw PV System with SolarEdge Battery with 225A MPU
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 8/6/25 Main panel not per plan, 100A Main disconnect and 125A Busbar is requested. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0625-00757
Permit Description: Rev. 2: 08/18/2025 --
Installation of a 7.38kw PV System with SolarEdge Battery with 225A MPU
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2025 | BULD - Electrical Clearance | Passed | Approved solar and battery - DGC/BAT Clearance to TEP is required for the solar meter | |
| 08/26/2025 | COT - RSOL - Electrical Final Solar Project | Passed |