Permit: TC-SOL-0625-00755
Permit Details
Apply Date:
06/05/2025
Applicant:
Project Manager
Description:
Rev. 1 -- Installation of a 8.715kw dc system with a Tesla Battery
Permit Reviews
Permit Number - TC-SOL-0625-00755
Permit Status: Complete
Permit Description: Rev. 1 --
Installation of a 8.715kw dc system with a Tesla Battery
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/23/2025 | RESIDENTIAL SOLAR REVISION v.1 | 07/23/2025 | APPROVED |
| 06/05/2025 | RESIDENTIAL SOLAR APP v.1 | 06/05/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0625-00755
Permite Description: Rev. 1 --
Installation of a 8.715kw dc system with a Tesla Battery
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the Tesla meter switch - DGL Clearance was called into TEP at 10 am Pending solar final |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0625-00755
Permit Description: Rev. 1 --
Installation of a 8.715kw dc system with a Tesla Battery
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2025 | BULD - Electrical Clearance | Passed | passed solar final 7/24/25 CLEARANCE DGC/BAT | |
| 07/24/2025 | COT - RSOL - Electrical Final Solar Project | Passed | passed solar final 7/24/25 CLEARANCE DGC/BAT |