Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla meter switch - DGL Clearance was called into TEP at 10 am Pending solar final |
|
| 07/24/2025 | BULD - Electrical Clearance | Passed | passed solar final 7/24/25 CLEARANCE DGC/BAT |