Permit: TC-SOL-0625-00732
Permit Details
Apply Date:
06/02/2025
Applicant:
Marytine Ramos
Description:
Revision 1 -- Installation of a 7.38kw PV System
Permit Reviews
Permit Number - TC-SOL-0625-00732
Permit Status: Complete
Permit Description: Revision 1 --
Installation of a 7.38kw PV System
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/23/2025 | RESIDENTIAL SOLAR REVISION v.1 | 07/23/2025 | APPROVED |
| 06/02/2025 | RESIDENTIAL SOLAR APP v.1 | 06/02/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0625-00732
Permite Description: Revision 1 --
Installation of a 7.38kw PV System
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/25/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 12:15pm Pending solar final |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0625-00732
Permit Description: Revision 1 --
Installation of a 7.38kw PV System
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 08/07/2025 | COT - RSOL - Electrical Final Solar Project | Passed |