Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2025 | BULD - Electrical Clearance | Passed | 6.23.25 Solar system verified as per plan. Proper bracing, wiring, labeling, and bonding/grounding all present. No collar no bat just DGC. |
|
| 07/25/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 12:15pm Pending solar final |
|
| 08/07/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 08/07/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter |