Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Solar
Address:
9327 E ANNE PL
Address NEW:
9327 E ANNE PL
Apply Date:
05/06/2025
Applicant:
Hailey McGraw
Description:
REV B: The main service panel rating has been revised, as reflected on PV-4 REV A: The main service panel rating has been revised 4.05 kW DC System- Roof Mount PV w/ storage ,MPU 200/200, existing system

Permit Reviews

Permit Number - TC-SOL-0525-00599
Permit Status: Inspections
Permit Description: REV B: The main service panel rating has been revised, as reflected on PV-4 REV A: The main service panel rating has been revised 4.05 kW DC System- Roof Mount PV w/ storage ,MPU 200/200, existing system
Start Date Submittal Complete Date Status  
06/17/2025 RESIDENTIAL SOLAR REVISION v.1 06/17/2025 APPROVED Review Details
06/02/2025 RESIDENTIAL SOLAR REVISION v.1 06/02/2025 APPROVED Review Details
05/06/2025 RESIDENTIAL SOLAR APP v.1 05/06/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0525-00599
Permite Description: REV B: The main service panel rating has been revised, as reflected on PV-4 REV A: The main service panel rating has been revised 4.05 kW DC System- Roof Mount PV w/ storage ,MPU 200/200, existing system
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/01/2025 BULD - Electrical Clearance N/A Partial Pass Partial for the Tesla switch - DGL Clearance was called into TEP at 11:00 am
Pending solar final (new panel has a 175A derate)

Completed Inspections

Permit Status: Inspections
Permit Number: TC-SOL-0525-00599
Permit Description: REV B: The main service panel rating has been revised, as reflected on PV-4 REV A: The main service panel rating has been revised 4.05 kW DC System- Roof Mount PV w/ storage ,MPU 200/200, existing system
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/03/2025 BULD - Electrical Clearance Passed 11.3.25
APPROVED DGC/BAT
11/03/2025 COT - RSOL - Electrical Final Solar Project Passed 11.3.25
APPROVED DGC/BAT

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-STAMPED PLANS_V1.PDF DOCUMENTS VIEW
CHECKLIST B_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REVISED PLANSET_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-557260_GLENN JOHNSON_STAMPED_PLANSET(FF_STAMPED) (RA_STAMPED)_V1.PDF DOCUMENTS VIEW
SOLARAPP CHECKLIST -SA20250506-9-611-447-A GLENN JOHNSON_V1.PDF DOCUMENTS VIEW
SOLARAPP DOCS SA20250506-9-611-447-A GLENN JOHNSON_V1.PDF DOCUMENTS VIEW