Permit: TC-SOL-0425-00573
Permit Details
Apply Date:
04/30/2025
Applicant:
Project Manager
Description:
REV 1: Install Pics REV 2: 09/09/2025 Installation of a 8.715kw dc system/1 Tesla Battery/MPU 125A
Permit Reviews
Permit Number - TC-SOL-0425-00573
Permit Status: Complete
Permit Description: REV 1: Install Pics
REV 2: 09/09/2025
Installation of a 8.715kw dc system/1 Tesla Battery/MPU 125A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/10/2025 | RESIDENTIAL SOLAR REVISION v.1 | 07/10/2025 | APPROVED |
| 04/30/2025 | RESIDENTIAL SOLAR APP v.1 | 04/30/2025 | APPROVED |
| 09/09/2025 | RESIDENTIAL SOLAR REVISION v.1 | 09/09/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-SOL-0425-00573
Permite Description: REV 1: Install Pics
REV 2: 09/09/2025
Installation of a 8.715kw dc system/1 Tesla Battery/MPU 125A
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 8/07/25 See previous notes, Tesla switch is still missing. Please revise plans. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-SOL-0425-00573
Permit Description: REV 1: Install Pics
REV 2: 09/09/2025
Installation of a 8.715kw dc system/1 Tesla Battery/MPU 125A
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2025 | BULD - Electrical Clearance | Passed | 9/11/25 TEP CLEARANCE: DGC/ BAT |
|
| 09/11/2025 | COT - RSOL - Electrical Final Solar Project | Passed |