Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2025 | BULD - Electrical Clearance | Canceled | by contractor | |
| 07/03/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the 200A service panel upgrade - INCR Clearance was called into TEP at 1:45 pm Pending solar |
|
| 07/11/2025 | BULD - Electrical Clearance | Not Ready | NR - attached plans show a Tesla switch, installation pictures do not | |
| 08/07/2025 | BULD - Electrical Clearance | Re-inspection required | 8/07/25 See previous notes, Tesla switch is still missing. Please revise plans. |
|
| 09/03/2025 | BULD - Electrical Clearance | Partial Pass | Partial for the Tesla switch -DGL Clearance was called into TEP at 10:10 am Pending solar final |
|
| 09/11/2025 | BULD - Electrical Clearance | Passed | 9/11/25 TEP CLEARANCE: DGC/ BAT |