Permit Details

Status:
Complete
Type:
Solar
Address NEW:
2826 E RICKEY VISTA
Apply Date:
04/11/2025
Applicant:
Inty Ops
Description:
REV B:As per the revision comment, we have changed the mpu model number and we also have changed the msp location. Installation of a 7.60 kW-AC PV System with Main Panel Upgrade 225A MAIN BUS RATING / 200A MAIN BREAKER

Permit Reviews

Permit Number - TC-SOL-0425-00485
Permit Status: Complete
Permit Description: REV B:As per the revision comment, we have changed the mpu model number and we also have changed the msp location. Installation of a 7.60 kW-AC PV System with Main Panel Upgrade 225A MAIN BUS RATING / 200A MAIN BREAKER
Start Date Submittal Complete Date Status  
04/14/2025 RESIDENTIAL SOLAR APP v.1 04/14/2025 APPROVED Review Details
05/12/2025 RESIDENTIAL SOLAR REVISION v.1 05/12/2025 APPROVED Review Details
04/22/2025 RESIDENTIAL SOLAR REVISION v.1 04/22/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-SOL-0425-00485
Permite Description: REV B:As per the revision comment, we have changed the mpu model number and we also have changed the msp location. Installation of a 7.60 kW-AC PV System with Main Panel Upgrade 225A MAIN BUS RATING / 200A MAIN BREAKER
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/19/2025 BULD - Electrical Clearance N/A Partial Pass 6/17/25
TEP CLEARANCE: INCR, Partial pass, pending solar.

Completed Inspections

Permit Status: Complete
Permit Number: TC-SOL-0425-00485
Permit Description: REV B:As per the revision comment, we have changed the mpu model number and we also have changed the msp location. Installation of a 7.60 kW-AC PV System with Main Panel Upgrade 225A MAIN BUS RATING / 200A MAIN BREAKER
Total Completed Inspections - 2
Date Description Inspector Results Comments
08/06/2025 BULD - Electrical Clearance Passed 8/6/25
TEP CLEARANCE: DGL/DGC, derate.
08/06/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
CHECKLIST SOLARAPP BRAUN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANSET_MARIA BRAUN_R2_V1.PDF DOCUMENTS VIEW
RESPONSE LETTER BRAUN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANS UPDATED MARIA_V1.PDF DOCUMENTS VIEW
CHECKLIST MARIA_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANSET MARIA_V1.PDF DOCUMENTS VIEW
SPECS SHEET MARIA_V1.PDF DOCUMENTS VIEW