Permit: TC-SOL-0326-00196
Permit Details
Apply Date:
03/20/2026
Applicant:
Juana Quiroz
Description:
Rooftop Mounted Solar Energy System PV+ST 22 SIL-410QD solar modules 1 SE7600H-US {240V} inverter 1 BAT-10K1P battery Main Panel Upgrade: Yes Derate: Yes System Size: 9.02 kW DC (7.6 kW AC)
Permit Reviews
Permit Number - TC-SOL-0326-00196
Permit Status: Inspections
Permit Description: Rooftop Mounted Solar Energy System
PV+ST
22 SIL-410QD solar modules
1 SE7600H-US {240V} inverter
1 BAT-10K1P battery
Main Panel Upgrade: Yes
Derate: Yes
System Size: 9.02 kW DC (7.6 kW AC)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/20/2026 | RESIDENTIAL SOLAR APP v.1 | N/A | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0326-00196
Permite Description: Rooftop Mounted Solar Energy System
PV+ST
22 SIL-410QD solar modules
1 SE7600H-US {240V} inverter
1 BAT-10K1P battery
Main Panel Upgrade: Yes
Derate: Yes
System Size: 9.02 kW DC (7.6 kW AC)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2026 | BULD - Electrical Clearance | N/A | Re-inspection required | 05/21/2026 Approved plans call for 100A main breaker. Currently installed in field is 125A breaker. |
| 05/21/2026 | COT - RSOL - Electrical Final Solar Project | N/A | Re-inspection required | 05/21/2026 Approved plans call for 100A main breaker. Currently installed in field is 125A breaker. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0326-00196
Permit Description: Rooftop Mounted Solar Energy System
PV+ST
22 SIL-410QD solar modules
1 SE7600H-US {240V} inverter
1 BAT-10K1P battery
Main Panel Upgrade: Yes
Derate: Yes
System Size: 9.02 kW DC (7.6 kW AC)
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2026 | BULD - Electrical Clearance | Passed | 05/21/2026 Approved clearance TEP DGC/BAT. Verified correction to prior inspection. |
|
| 05/21/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 05/21/2026 Approved clearance TEP DGC/BAT. Verified correction to prior inspection. |