Permit: TC-SOL-0126-00039
Permit Details
Apply Date:
01/22/2026
Applicant:
alex enoch
Description:
REV_2 (10/7/2026) REV. 1: 04/09/2026 roof mount pv, triplex
Permit Reviews
Permit Number - TC-SOL-0126-00039
Permit Status: Issued
Permit Description: REV_2 (10/7/2026)
REV. 1: 04/09/2026
roof mount pv, triplex
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/23/2026 | RESIDENTIAL SOLAR APP v.1 | 01/23/2026 | APPROVED |
| 04/09/2026 | RESIDENTIAL SOLAR REVISION v.2 | N/A | APPROVED |
| 04/09/2026 | RESIDENTIAL SOLAR REVISION v.1 | N/A | REQUIRES RESUBMIT |
| 10/07/2026 | RESIDENTIAL SOLAR REVISION v.1 | N/A | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-SOL-0126-00039
Permite Description: REV_2 (10/7/2026)
REV. 1: 04/09/2026
roof mount pv, triplex
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2026 | BULD - Electrical Clearance | N/A | Re-inspection required | 08/14/2026 Current field configuration has a 40A PV breaker inside a sub panel. Plans call for a 60A meter socket adapter at the main service entrance. Please revise plans to show PV breaker at sub panel and size according to approved plans and SolarAPP checklist. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-SOL-0126-00039
Permit Description: REV_2 (10/7/2026)
REV. 1: 04/09/2026
roof mount pv, triplex
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2026 | COT - RSOL - Electrical Final Solar Project | Passed | 10-13-26 Electrical final approved all items have been corrected |